My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-11-25_GENERAL DOCUMENTS - P2013006
DRMS
>
Day Forward
>
General Documents
>
Prospect
>
P2013006
>
2014-11-25_GENERAL DOCUMENTS - P2013006
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:55:36 PM
Creation date
12/12/2014 7:49:35 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
P2013006
IBM Index Class Name
General Documents
Doc Date
11/25/2014
Doc Name
Updated Reclamation Cost Packet
From
DRMS
To
Fortune Revenue Silver Mines
Permit Index Doc Type
General Correspondence
Email Name
RCO
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 1 of 2 <br /> WHEEL LOADER-LOAD AND CARRY WORK <br /> Task description: Grade drill pads and replace topsoil <br /> Site: Revenue Mine Permit Action: 2014 Review Permit/Job#: P2013006 <br /> PROJECT IDENTIFICATION <br /> Task#: 02A State: Colorado Abbreviation: None <br /> Date: 11/24/2014_ County: Ouray Filename: P006-02_A <br /> User: RCO <br /> Agency or organization name: DRMS <br /> HOURLY EQUIPMENT COST <br /> Basic Machine: CAT 924G Horsepower: 128 <br /> Attachment 1: ROPS Cab Shift Basis: I per day <br /> Data Source: (CRG) <br /> Cost Breakdown: <br /> Utilization% <br /> Ownership Cost/Hour: $12.27 NA <br /> Operating Cost/Hour: $29.88 100 <br /> Operator Cost/Hour: $37.13 NA <br /> Total Unit Cost/Hour: $79.28 <br /> Total Fleet Cost/Hour: $79.28 <br /> MATERIAL QUANTITIES <br /> Initial volume: 167 CCY Swell factor: 1.270 <br /> Loose volume: 212 LCY <br /> Source of estimated volume: Division of Reclamation,Mining&Safety <br /> Source of estimated swell factor: Cat Handbook <br /> HOURLY PRODUCTION <br /> Loader Cycle Time: Unadjusted Basic Cycle Time(load,dump,maneuver): 0.475 minutes <br /> _ <br /> Cycle Time Factors Factor min. Source <br /> Material: Mixed material 0.02 0.020 Cat HB <br /> Stockpile: Conveyor or dozer piled 10 ft.high or less 0.01 0.010 (Cat HB) <br /> Truck Ownership: No adjustment-factor not applicable 0.00 0.000 Cat HB_ <br /> Operation: Inconsistent operation 0.04 0.040 (Cat HB) <br /> Dump Target: Small target 0.04 1 0.040 Cat HB) <br /> Net Cycle Time Adjustment: 0.110 minutes <br /> Adjusted Basic Cycle Time: 0.585 minutes <br /> Rolling Resistance—Road Conditions <br /> Haul: Soft,rutted dirt,no maintenance or water,4"tire penetration 8.0 <br /> Return: Soft,rutted dirt,no maintenance or water,4"tire penetration 8.0 <br /> Haul and Return Time <br /> Length Grade Res. Rolling Total Res. Travel Time <br /> (feet) % _ Res.(%) % (minutes) Source <br /> Haul Route: 30 0.00 8.00 8.00 0.0285 Cat HB <br /> Return Route: 30 0.00 8.00 8.00 0.0285 (Cat HB <br /> CIRCES Cost Estimating Software <br />
The URL can be used to link to this page
Your browser does not support the video tag.