My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-11-25_GENERAL DOCUMENTS - P2011030
DRMS
>
Day Forward
>
General Documents
>
Prospect
>
P2011030
>
2014-11-25_GENERAL DOCUMENTS - P2011030
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:55:36 PM
Creation date
12/12/2014 7:49:34 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
P2011030
IBM Index Class Name
General Documents
Doc Date
11/25/2014
Doc Name
Updated NOI Reclamation Cost Packet.
From
DRMS
To
Fortune Revenue Silver Mines
Permit Index Doc Type
General Correspondence
Email Name
RCO
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mobilization Worksheet Cont'd Task#04A Page 2 of 2 <br /> EOUIPMENT HAUL DISTANCE and Time <br /> Nearest Major City or Town within project area region: MONTROSE <br /> Total one-way travel distance: 45.00 miles <br /> Average Travel Speed: 35.00 mph <br /> Total Non-Roadable Mob/Demob Cost* $2,594.74 <br /> two round trips with haul rig: <br /> Total Roadable Mob/Demob Cost** $131.09 <br /> **one round trip,no haul rig: <br /> Transportation Cycle Time: <br /> Non-Roadable Roadable <br /> Equipment <br /> _ Equipment <br /> Haul Time(Hours): 1.29 1.29 <br /> Return Time(Hours): 1.29 1.29 <br /> Loading Time(Hours): 0.50 NA <br /> Unloading Time(Hours): 0.50 NA <br /> Subtotals: 3.57 2.57 <br /> JOB TIME AND COST <br /> Total job time: 7.14 Hours <br /> Total job cost: $2,726 <br /> CIRCES Cost Estimating Software <br />
The URL can be used to link to this page
Your browser does not support the video tag.