Laserfiche WebLink
Page I of 2 <br /> EQUIPMENT MOBILIZATION/DEMOBILIZATION <br /> Task description: Haul reclamation equipment to and from site <br /> Site: Revenue Mine Exploration Permit Action: 2014 Review Permit/Job#: P2011030 <br /> PROJECT IDENTIFICATION <br /> Task#: 04A State: Colorado_ Abbreviation: None <br /> Date: 11/24/2014 County: Ouray Filename: P030-04A <br /> User: RCO <br /> Agency or organization name: DBMS <br /> EQUIPMENT TRANSPORT RIG COST <br /> Shift basis: 1 per day - <br /> Cost Data Source: CRG Data <br /> Truck Tractor Description: GENERIC ON-HIGHWAY TRUCK TRACTOR,6X4,DIESEL POWERED, <br /> 400 HP(2ND HALF,2006) <br /> Truck Trailer Description: GENERIC FOLDING GOOSENECK,DROP DECK EQUIPMENT TRAILER <br /> (25T,50T,AND 100T) <br /> Cost Breakdown: <br /> Available Rig Capacities 0-25 Tons 26-50 Tons _ Slt Tons <br /> Ownership Cost/Hour: $16.63 $18.37 $22.33 <br /> _ <br /> Operating Cost/Hour: $44.38 $46.13 $50.07 <br /> Operator Cost/Hour: $27.66 $27.66 $27.66 <br /> Helper Cost/Hour: $0.00 $25.39 $25.39 _ <br /> Total Unit Cost/Hour: $88.67 $117.55 $125.45 <br /> NON ROADABLE EOUIPMENT: <br /> Machine Weight/ Owner ship Haul Rig Fleet Haul Trip Return Trip DOT Permit <br /> Description Unit Cost/hr/unit Cost/hr/unit Size Cost/hr/ Cost/hr/fleet Cost/fleet <br /> TONS fleet <br /> Cat 136T LGP 28.63 $0.00 $117.55 1 $117.55 $117.55 $250.00 <br /> Cat 320D LRR 9'- 23.70 $26.63 $88.67 1 $115.30 $88.67 $250.00 <br /> 6"Stick <br /> Subtotals: $232.85 $206.22 $500.00 <br /> ROADABLE EOUIPMENT: <br /> Machine Description Total Cost/hr/unit Fleet Size 7 Haul Trip Return Trip <br /> _ �Cost/hr/fleet Cost/hr/fleet <br /> Light Du Pickup,4x4,1 T.Crew $25.49 2 $50.98 T $50.98 <br /> Subtotals: $50.98 $50.98 <br /> CIRCES Cost Estimating Software <br />