Laserfiche WebLink
amec , <br /> CQA ACTIVITIES: <br /> 1) Field Activities: Field activities and observation during this reporting period included: Slope gradi Tg <br /> and fill placement; SLF sampling; clearing and grubbing-, underground working remediation. <br /> 11) Laboratory Activities: Permeability, Atterberg limits, moisture, and sieve analysis laboratory testing <br /> continued. <br /> The following samples were collected and returned to AMEC's laboratory for analysis: <br /> Soil Liner Fill sample SLF-166C (Control sample from the Cameron site) <br /> General Proiect Items <br /> Meetings and Discussions: <br /> The Weekly Contractor Meeting for November 26, 2014 was cancelled. <br /> Ames daily safety meetings <br /> Summary of Concerns: None. <br /> CC&V: Daily updates, reporting, and scheduling are some of the tasks occurring between CC&V <br /> Projects, AMEC, and Ames. <br /> Miscellaneous: None. <br /> Deliveries: None. <br /> Submitted by,_ renson Date: December 1, 2014 <br /> Rey,16v'ed by:/"`-I L Date: December 1, 2014 <br /> TIm Burkhera <br /> Project Resident <br /> Phone: 719-689-2986 <br /> CC&V Projects <br /> Reviewed By: Date: /2. 1-3 jZ o _ <br /> Reviewed By: Date: <br /> 2014-11-29-MLE2 WEEKLY FINAL Page 3 of E <br />