Laserfiche WebLink
William A. Bear <br />Page 2 of 2 <br />November 25, 2014 <br />4. Please also update Map 18, Postmining Topography, to show the planned postmining topography of the <br />borrow area and demonstrate compliance with Rule 4.14.1(2)(a). <br />5. The proposed borrow area will be excavated in close proximity to power lines and the support structures for <br />the Bowie No. 2 Mine loadout conveyor. If the foundations of these structures were damaged, they could <br />fall into an area that is outside of the currently approved permit boundary, or possibly disrupt electrical <br />service provided by the power line. Please provide information that demonstrates that the proposed <br />borrow material excavation will not compromise the stability of the power line and conveyor belt adjacent <br />to the borrow area resulting in damage to private property (the adjacent Terror Creek Loadout facility) or <br />disruption of electric service (Rules 4.04(5) and (6)). <br />6. The reclamation costs associated with this revision will be dependent on resolution of the above issues. <br />Therefore the Division will provide comments regarding BRL's estimated reclamation costs after the above <br />issues have been resolved. <br />If you have any questions or need additional information, please contact me. <br />Sincerely, <br />Susan L. Burgmaier <br />Environmental Protection Specialist <br />cc: Tamme Bishop, J.E. Stover & Associates <br />