My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-12-05_REVISION - C1996083
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1996083
>
2014-12-05_REVISION - C1996083
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:55:50 PM
Creation date
12/8/2014 8:19:09 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1996083
IBM Index Class Name
Revision
Doc Date
12/5/2014
Doc Name
Midterm Review (MT4) Reclamation Cost Estimate
From
J.E. Stover & Associates
To
DRMS
Type & Sequence
MT4
Email Name
SLB
DIH
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
12/8/2014 State.co.us Executive Branch Mail - Re: Bowie No. 2 Mine C1996083 Midterm Review (MT4) Reclamation Cost Estimate <br />STATE, OF Hernandez - DNR Alysha <aysha- hernandez @state- co -us> <br />COLORADO <br />Burgmaier - DNR, Susan <susan.burgmaier @ state.co.us> Fri, Dec 5, 2014 at 1:08 PM <br />To: Tamme Bishop <tam me.jestover@bres nan. net> <br />Cc: Bill Bear <BBear @bowieresources.com >, Alysha Hernandez - DNR <alysha.hernandez @state.co.us> <br />Tamme - The information you have provided regarding Task #40 of the midterm review cost estimate is <br />reasonable. I will revise the estimate to reflect this comment as well as your comments of November 21, 2014 <br />and transmit a revised estimate to BRL. The revised estimate will include all of the revisions approved to date. <br />After BRL has reviewed the estimate, if there are no further comments, the Division will initiate a surety increase <br />permitting action (SI -1) for the Bowie No. 2 Mine permit. <br />The hearing and notice requirements of Rule 3.02.2(4)(b) will apply to the surety increase permitting action. After <br />the Division's public notice, there will be a 30 day comment period at the close of which BRL must post the <br />additional bond. The Division approved an increase rider for the Bowie No. 2 Mine today, so we currently hold <br />$12,446,699.61 in corporate sureties. Most likely, BRL will have excess bond posted when the surety increase <br />becomes final. <br />Susan L. Burgmaier <br />1111111MINWIFAMMKIRM <br />CO 1. <br />Division. of Rec'Uarriation, <br />Mir ing arul Safety <br />Department (,)l N U,v a,l } es(,x.Awes <br />1313 Sherman Street, Room 215, Denver, CO y <br />On Wed, Dec 3, 2014 at 10:35 AM, Tamme Bishop <tam me.jestover@bresnan. net> wrote: <br />Hi Susan - <br />3) For Task #40, of the 200,000 that could be stored in the drying area at gob pile <br />#2, no more than 50% will be hauled elsewhere on the pile to be placed and <br />compacted. <br />If you will recall, this spring when the contractor began re- handling the stockpiled <br />gob on top of gob pile #2, very little, if any, was hauled off of the top to be mixed <br />https: / /mail.googl e.com /m ai I /u/0 / ?ui =2 &i k= e29129fcb5 &view =pt &search= i nbox &th =14al c11 a2cdl646a &si m l =14al c11 a2cdl646a 1/3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.