My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-09-27_HYDROLOGY - P2010026
DRMS
>
Day Forward
>
Hydrology
>
Prospect
>
P2010026
>
2014-09-27_HYDROLOGY - P2010026
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:48:09 PM
Creation date
12/5/2014 2:48:59 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
P2010026
IBM Index Class Name
HYDROLOGY
Doc Date
9/27/2014
Doc Name
UIC Permit No. CO32210-00000.
From
SFOGI
To
EPA
Permit Index Doc Type
Hydrology Report
Email Name
THM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Does the annulus pressure build back up after the test ? 34s <br />MECHANICAL INTEGRITY PRESSURE TEST <br />Additional comments for mechanical integrity pressure test, such as volume of fluid added to <br />annulus and bled back at end of test, reason for failing test (casing head leak, tubing leak, <br />other), etc.: <br />C00 pSi "AGr Afr wM11,,04,0 4 cr-O-zeO 6 i SA-,tv,TeL 04 <br />SAN SCL 0 q G WC (0/pp4e-) s 40,EM 370 Psi cNDea Ir 3foel psi <br />59W C t1A -aT 4T7- r1C4-1-GO <br />so6or &e�f4 o,u swevGG Cv►sq�� -e <br />Signature of Witness: ,,� ,� �� 00>OR <br />[ ] Data Entry I Compliance Staff [ ] 2"d Data Entry [ ] Hardcopy <br />Filing <br />s t i�l <br />3 SO Ps l <br />90 miniltes- <br />347 P$/ <br />25 rninilte.-, <br />q ps f <br />30 1-ninutes- <br />3q o psi <br />RESULT <br />[XI. Pass [ <br />Fait <br />[ ] Pass [ <br />Fail <br />[ ] Pass [ <br />]Fail <br />Does the annulus pressure build back up after the test ? 34s <br />MECHANICAL INTEGRITY PRESSURE TEST <br />Additional comments for mechanical integrity pressure test, such as volume of fluid added to <br />annulus and bled back at end of test, reason for failing test (casing head leak, tubing leak, <br />other), etc.: <br />C00 pSi "AGr Afr wM11,,04,0 4 cr-O-zeO 6 i SA-,tv,TeL 04 <br />SAN SCL 0 q G WC (0/pp4e-) s 40,EM 370 Psi cNDea Ir 3foel psi <br />59W C t1A -aT 4T7- r1C4-1-GO <br />so6or &e�f4 o,u swevGG Cv►sq�� -e <br />Signature of Witness: ,,� ,� �� 00>OR <br />[ ] Data Entry I Compliance Staff [ ] 2"d Data Entry [ ] Hardcopy <br />Filing <br />
The URL can be used to link to this page
Your browser does not support the video tag.