My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-11-25_REVISION - M1979191 (29)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1979191
>
2014-11-25_REVISION - M1979191 (29)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 2:30:18 PM
Creation date
11/28/2014 11:48:43 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1979191
IBM Index Class Name
REVISION
Doc Date
11/25/2014
Doc Name
Ex. L- Reclamation Costs
From
Martin Marietta
To
DRMS
Type & Sequence
AM1
Email Name
ECS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Ditullio Property Reclamation Costs <br />Direct Reclamation Costs <br />Phase 1 <br />Item <br />Unit <br />Quantity <br />Unit Price <br />Extension <br />1 Mobil ization /Demobilizaiton <br />LS <br />1 <br />$ 5,000 <br />$ 5,000 <br />2 Dewatering <br />LS <br />1 <br />$ 18,300 <br />$ 18,300 <br />3 Highwall Excavation <br />CY <br />2,000 <br />$ 2 <br />$ 4,000 <br />4 Foundation Preparation /Keyway Preparation <br />LF <br />1,910 <br />1 $ 5 <br />$ 9,550 <br />7 Zone 1a Slope Liner <br />CY <br />40,000 <br />$ 4 <br />$ 140,000 <br />8 Revegetation <br />AC <br />1 <br />$ 200 <br />$ 196 <br />Ditullio Phase 1 Subtotal <br />$ 177,046 <br />Phase 3 <br />Item <br />Unit <br />Quantity <br />Unit Price <br />Extension <br />1 Mobil ization /Demobilizaiton <br />LS <br />1 <br />$ 5,000 <br />$ 5,000 <br />2 Dewatering <br />LS <br />1 <br />$ 18,300 <br />$ 18,300 <br />3 Highwall Excavation <br />CY <br />2,000 <br />$ 2 <br />$ 4,000 <br />4 Foundation Preparation /Keyway Preparation <br />LF <br />4,680 <br />$ 5 <br />$ 23,400 <br />6 Roadway Fill <br />CY <br />10,000 <br />$ 4 <br />$ 35,000 <br />7 Zone la Slope Liner <br />CY <br />69,000 <br />$ 4 <br />$ 241,500 <br />8 Revegetation <br />AC <br />3 <br />$ 200 <br />$ 572 <br />Ditullio Phase 3 Subtotal <br />$ 327,772 <br />Phase 4 <br />Item <br />Unit <br />Quantity <br />Unit Price <br />Extension <br />1 Mobil ization /Demobilizaiton <br />LS <br />1 <br />$ 5,000 <br />$ 5,000 <br />2 Dewatering <br />LS <br />1 <br />$ 18,300 <br />$ 18,300 <br />3 Highwall Excavation <br />CY <br />2,000 <br />$ 2 <br />$ 4,000 <br />4 Foundation Preparation /Keyway Preparation <br />LF <br />6,670 <br />$ 5 <br />$ 33,350 <br />5 Phase 4 Backfill <br />CY <br />442,000 <br />$ 2 <br />$ 884,000 <br />7 Zone la Slope Liner <br />CY <br />163,000 <br />$ 4 <br />$ 570,500 <br />8 Revegetation <br />AC <br />10 <br />$ 200 <br />$ 2,052 <br />Ditullio Phase 4 Subtotal $ 1,517,202 <br />Phase 2 and 5 Revegetation <br />Item <br />Unit <br />Quantity <br />Unit Price <br />Extension <br />2 Revegetation <br />AC <br />22 <br />$ 200 <br />$ 4,400 <br />Total Reclamation Cost for Ditullio - Phase 2 and 5 $ 4,400 <br />Ditullio Direct Reclamation Costs Subtotal $ 2,022,020 <br />
The URL can be used to link to this page
Your browser does not support the video tag.