My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-11-25_REVISION - M1979191 (30)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1979191
>
2014-11-25_REVISION - M1979191 (30)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 2:30:18 PM
Creation date
11/28/2014 11:47:14 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1979191
IBM Index Class Name
REVISION
Doc Date
11/25/2014
Doc Name
Geotechnical Stability Analysis
From
GEI
To
DRMS
Type & Sequence
AM1
Email Name
ECS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 4 Mr. Eric Scott <br />November 3, 2014 Colorado DRMS <br />Weathered Shale 120 50 15 <br />The Ditullio slope liner design was modeled with a general section developed from the most <br />conservative conditions encountered at the site, more conservative than those utilized for <br />Veldman property, including 4 feet of overburden overlying a 14.4 foot thick layer of sand <br />and gravel. Beneath the sand and gravel, a 2.5 foot thick layer of weathered, residual <br />strength bedrock. Beneath this layer of residual strength bedrock we modelled undisturbed <br />shale bedrock. <br />The closest structure to mine excavation limits is listed in Table 2. Only the closest structure <br />was modeled, per DBMS suggestion. It is assumed any structure beyond this distance will <br />have a higher factor of safety. Thus, this closest permanent structure is the critical, lowest <br />stability value. The general cross - section is shown on Figure 5. <br />Table 2: Structures and Entities within 200 Feet of Excavation Limits <br />Structure <br />Structure Owner <br />Distance to Structure <br />Power line pole <br />Poudre Valley REA <br />29 feet from excavation <br />Stability analyses were run on randomly generated circles generated through the mine <br />excavation and highwall intersecting the location of only the closest permanent structure. <br />The Slope/W program calculated the Factors of Safety (FOS) using the ordinary, Bishop, <br />Janbu, and Spencer Methods. The Spencer FOS correlates more closely with observations of <br />actual slope failure, providing a realistic and more rigorous FOS. On the annotated cross <br />sections (Attachment A), the Spencer FOS is listed. The results of the analyses are listed in <br />Table 3. <br />Table 3: Stability Results for Excavation in Proximity to Utilities <br />Structure <br />Distance to Structure <br />Factor of Safety <br />Power line pole <br />29 feet <br />1 1.2 <br />GEI <br />
The URL can be used to link to this page
Your browser does not support the video tag.