Laserfiche WebLink
• XXVI MULTIPLE SERVICES BUILDING <br />Removal of Structures <br />Water Tank Removal - <br />100,000 gal. x 1cf/7.48 gal. x 1 cy/27cf = 495 cy <br />Demolition and Removal: 13,369 cf at $0.14/cf = $ 1,872.00 <br />Demolition of 1' x 2' footer 94.25 if at $6.95/lf = $ 655.02 <br />Disposal of Concrete 6.98 cy at 4.32/cy = $ 30.15 <br />Building Removal <br />125 ft. x 50 ft. x 20 ft. = 125,000 cf = 4,630 cy <br />Demolition and Removal: 125,000 cf @ $0.14/cf = $17,500.00 <br />Demolition of 6" wire reinformed pad at $2.31/sf = $14,437.50 <br />Demolition of 1' x 2" footer 350 if at $6.95/lf = $ 2,432.50 <br />Disposal of concrete 141.67 cy at $4.32/cy = $ 612.00 <br />Equipment Removal - <br />6 pumps x 2 manshifts/pump x $150.00/manshift = $ 1,800.00 <br />• 3 Air compressors x $300.00 each = $ 900.00 <br />Tanks - <br />6 tanks x 2 manshifts/tank x $150.00/manshift = $ 1,800.00 <br />(NOTE: Three 500 gal. tanks are made for removal, <br />by the supplier and are not included <br />~ in this calculation.) f <br />Other Equipment <br />2 pieces x 2 manshifts/piece x $150.00/manshift = $ 600.00 <br />SUBTOTAL = $42,639.17 <br />Indirect costs (overhead/profit/performance bonds/ <br />engineering/job superintendent etc.,) 20~ = $ 8,527.83 <br />TOTAL BOND = $51,167.00 <br />Topsoil and seeding etc. part of SA Portal <br />and Redrock Crusher sites reclamation bond. <br />Round to $51,000.00 for Total Bond Required. <br />• 30 <br />