Laserfiche WebLink
~,s <br />XXV MAGAZINE ~ ~^~'"' ~? ~ % B /; ~a <br />n0 <br />Assumption: The following activities will occur: <br />1. fence removal <br />2. cement pad (2) removal and disposal <br />3. topsoil redistribution <br />4. seeding <br />Fence Removal <br />1. remove 400 linear feet <br />2. $1.19/linear foot to remove <br />400 x $1.19 = $ 476 <br />Pad Removal <br />1. pad 3.5 x 3.5 = 12.25 ftz <br />8 x 6 = 48 <br />60.25 ftz <br />2. removal cut <br />$327/ftz x 60.25 ftz = $ 197 <br />Disposal of Contrete <br />1. 60.25 ftz x .52 = 1.1 cy <br />2. disposal cost $2.90/cy <br />$290/cy x 1.1 cy = $ 3 <br />Topsoil Redistribution <br />1. 105 cy <br />2. cost $1.82/cy <br />$182/cy x 185 = $ 337 <br />Feeding <br />2 ac x $645/ac = $ 129 <br />1,142 <br />l0Y P.dministrative Fees $ 114 <br />1,256 <br />say $1,300 <br />29 <br />