Laserfiche WebLink
• W. F. STRIP PIT T.R. <br />May 1987 <br />VII. WILLIAMS FORK STRIP PIT N0. 2 <br />EARTHWORK <br />Grade and fill (300 H.P. Dozer; 300' Push; Common Earth; pg. 30) <br />90,500 cy @ $1.00/cy = $90,500.00 <br />Topsoil redistribution <br />22,600 cy x $1.82/yd = <br />Seeding, mulching, and fertilizing <br />95.4 acres @ $641.45/acre <br />Total Williams Fork Strip Pit No. 2 = <br />,~ <br /> <br />$41,132.00 <br />$61,194.33 <br />$192,826.33 <br />9R <br />