Laserfiche WebLink
VI. TOWN LOADOUT <br />REMOVAL OF STRUCTURE <br />Rootings 100' x $15.89/lf $1,589.00 <br />rnorui.inov <br />Earthwork 3,000 cy @ $1.99/cy = $5,970.00 <br />150' haul, 200 hp dozer <br />Topsoil redistribution <br />3,000 cy @ $1.82/cy = $5,460.00 <br />Seeding, mulching, and fertilizing <br />$641.45/ac x3.7 act _ $2,373.00 <br />Total Town Loadout = $15,392.00 <br /> <br />l_ J <br />8 <br />