Laserfiche WebLink
11/25/2014 State.co.us Executive Branch Mail - Bowie No. 2 Mine C1996083 MT -4 Reclamation Cost Estimate Comments Response <br />❑ Task #35 is accurate, and Task #36 is redundant and could be removed entirely from the estimate. <br />3) Task #40 is to haul 425,000 cy of gob out of drying areas at gob pile #2 and #3. <br />❑ Gob stored in the drying areas at gob pile #2 and #3 are handled differently. The drying area at gob pile #2 is <br />stacked in windrows and the material can either be placed on top of the pile where it is stockpiled or hauled to another <br />area. I think assuming that 100% of the gob in the drying area at #2 will have to be hauled somewhere other than where <br />it is stockpiled is not entirely accurate. Some reduction in the amount to be hauled should be considered. <br />4) Task #45E is to haul material from 13-portal storage area to gob pile #2. <br />5) Task #14 is hauling fill from the adjacent material storage area to the B seam portal bench (61,745 cy). Task #14 in <br />the 2013 reclamation estimate (Permit Renewal 3) uses the same quantity, 61,745 cy. I could not locate a credit to Task <br />#14 based on the volume used in Task #45E. <br />6) The description for Task #46 should be corrected to state 2.5' of cover, currently it shows 3.5' of cover replacement <br />for gob pile #3. Quantity used in item breakdown is correct. <br />7) The bond associated with TR -93 should offset some of Task #36 and Task #40 <br />I will be leaving around noon today, but will be available on my cell phone if you need to talk to me, 970 - 261 -3920. If <br />not, I will be here Monday and Tuesday of next week. Thanks! <br />Tarnme Bishop, P.E. <br />JE Stover & Associates, Inc. <br />2352 N. 7th Street, Unit B <br />Grand Junction, CO 81501 <br />970- 245 -4101 <br />https: //m ai I . googl e. com /m ai I /u/0 / ?ui =2 &i k= 4546421 a5a &vi ew= pt &search= i nbox &th= 149e899948958851 &s i m I = 149e899948958851 2/2 <br />