My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-11-25_REVISION - C1996083
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1996083
>
2014-11-25_REVISION - C1996083
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:55:38 PM
Creation date
11/25/2014 1:25:10 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1996083
IBM Index Class Name
Revision
Doc Date
11/25/2014
Doc Name
Reclamation Cost Estimate Comments Response
From
J.E. Stover & Associates
To
DRMS
Type & Sequence
MT4
Email Name
SLB
DIH
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
11/25/2014 State.co.us Executive Branch Mail - Bowie No. 2 Mine C1996083 MT -4 Reclamation Cost Estimate Comments Response <br />Response <br />1 message <br />Burgmaier - DNR, Susan <susan.burgmaier @state.co.us> <br />To: Tamme Bishop <tam me.jestover@bres nan. net> <br />Cc: Alysha Hernandez - DNR <alysha.hernandez @state.co.us >, Bill <br />Rodriguez - DNR <mary.rodriguez @state.co.us> <br />Tamme - I reviewed your comments, and offer the following: <br />1) and 2) Comments noted; DRMS revise the estimate accordingly. <br />Tue, Nov 25, 2014 at 1:16 PM <br />Bear <BBear @bowieresources.com >, Mary <br />3) Please provide the volumes /distances you believe would reflect on- the - ground conditions. DRMS will <br />consider the information and adjust the estimate if appropriate. <br />4) Task 45E was added to reflect the increased haul distance to bring in the required cover material for Gob Pile <br />#2/ #4. Even though the material has already been moved, until we grant Phase I release on Gob Pile #4 the <br />reclamation liability remains. <br />5) There are two tasks to haul fill from the material storage areas to the B bench - Tasks 13 and 14. Task 13 <br />was reduced with the material storage expansion under TRs 79 and 83, and the reduced volume was carried into <br />the MT -4 estimate. <br />6) Comment noted; DRMS will revise the description for Task 46.. <br />7) The estimate will be revised for the TR -93 estimate and any revisions since then, so that the total will reflect <br />all revisions to that point. The new revised total will be the grand total for reclamation liability of the entire site. <br />BRL would then be required to post the difference between the grand total and what's been posted to date. (BRL <br />hasn't posted the bond for TR -93 yet). <br />Once BRL has provided the information under Item 3, DRMS will revise the estimate and forward it to BRL. <br />Susan L. Burgmaier <br />Coat Regulatory Program <br />A17COL011RADO <br />Division of 1 ecta�naa- tio�rn., <br />Mining and Safety <br />Depwtrrient of Nal.ural 1�esources <br />https: //m ai I . googl e. com /m ai I /u/0 / ?ui =2 &i k= 4546421 a5a &vi ew= pt &search= i nbox &th= 149e899948958851 &s i m I = 149e899948958851 1/2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.