Laserfiche WebLink
Bowie No. 2 Mine C 1996083 Technical Revision No. 93 <br />TRUCK/LOADER TEAM WORK <br />Page 4 of 7 <br />Task description: Haul refuse out of Gob Pile #2/ #3 drying areas for placement <br />Site: Bowie No. 2 Mine Permit Action: Technical Revision 93 Permit/Job #: C 1996083 <br />PROJECT IDENTIFICATION <br />Task #: 040 State: Colorado <br />Date: 10/6/2014 County: Delta <br />User: SLB <br />Agency or organization name: DBMS <br />HOURLY EQUIPMENT COST <br />Truck Loader Team - Truck: Generic 10 -12 c , 6x4 <br />- Loader: Cat 345D L 12' -10" Stick <br />Support Equipment -Load Area: NA <br />-Dump Area: NA <br />Road Maintenance —Motor Grader: NA <br />-Water Truck: NA <br />Abbreviation: None <br />Filename: C083 -040 <br />Shift basis: 1 per day <br />Cost Breakdown: Truck/Loader Team Sunnort EaUlDment Maintenance Eauipment <br />Total work team cost/hour: $356.48 <br />MATERIAL OUANTITIES <br />Initial volume: 50,000 CCY <br />Loose volume: 50,000 LCY <br />Source of estimated volume: Volume XI, pa <br />Source of estimated swell factor: Cat Handbook <br />Material Purchase Cost: $0.00 <br />Total Cost: $0.00 <br />HOURLY PRODUCTION <br />Truck Capacity: <br />Truck Payload (weight) Basis: <br />Material weight: 1,600 <br />Description: Coal - <br />Rated Payload: 35,40( <br />Payload Capacity: 22.13 <br />Raw <br />Swell factor: 1.000 <br />4a <br />Pounds /LCY <br />Pounds <br />LC Y <br />CIRCES Cost Estimating Software <br />Truck <br />Excavator <br />Load Area <br />Dump Area <br />Motor Grader <br />Water Truck <br />%Utilization- machine: <br />100 <br />100 <br />NA <br />NA <br />NA <br />NA <br />Ownership cost/hour: <br />$12.65 <br />$62.81 <br />NA <br />NA <br />NA <br />NA <br />Operating cost /hour: <br />$63.40 <br />$113.40 <br />NA <br />NA <br />NA <br />NA <br />Ripper op. cost/hour: <br />NA <br />$0.00 <br />NA <br />NA <br />NA <br />NA <br />Operator cost/hour: <br />$0.00 <br />$28.17 <br />NA <br />NA <br />NA <br />NA <br />Unit Subtotals: <br />$76.05 <br />$204.38 <br />NA <br />NA <br />NA <br />NA <br />Number of Units: <br />2 <br />1 <br />0 <br />0 <br />0 <br />0 <br />Group Subtotals: <br />Work: $356.48 <br />Support: $0.00 <br />Maint: $0.00 <br />Total work team cost/hour: $356.48 <br />MATERIAL OUANTITIES <br />Initial volume: 50,000 CCY <br />Loose volume: 50,000 LCY <br />Source of estimated volume: Volume XI, pa <br />Source of estimated swell factor: Cat Handbook <br />Material Purchase Cost: $0.00 <br />Total Cost: $0.00 <br />HOURLY PRODUCTION <br />Truck Capacity: <br />Truck Payload (weight) Basis: <br />Material weight: 1,600 <br />Description: Coal - <br />Rated Payload: 35,40( <br />Payload Capacity: 22.13 <br />Raw <br />Swell factor: 1.000 <br />4a <br />Pounds /LCY <br />Pounds <br />LC Y <br />CIRCES Cost Estimating Software <br />