Laserfiche WebLink
Bowie No. 2 Mine C1996083 Technical Revision No. 93 Page 3 of 7 <br />Dozing method: <br />Visibility: <br />Job efficiency: <br />Spoil pile: <br />Push gradient: <br />Altitude: <br />Material Weight: <br />Blade type: <br />1.000 <br />(GEN.) <br />1.000 <br />(AVG.) <br />0.830 <br />(1 SHIFT /DAY) <br />1.000 <br />(DOZ -OC) <br />0.903 <br />(CAT HB) <br />1.000 <br />(CAT HB) <br />0.862 <br />(CAT HB) <br />1.000 <br />(PAT) <br />Net correction: 0.5330 <br />Adjusted unit production: 504.22 LCY /hr <br />Adjusted fleet production: 2016.88 LCY/hr <br />JOB TIME AND COST <br />Fleet size: <br />4 Dozer(s) <br />Unit cost: <br />$0.680 /LCY <br />Total job time: <br />24.79 Hours <br />Total job cost: <br />$33,978 <br />CIRCES Cost Estimating Software <br />