Laserfiche WebLink
November 13, 2014 C-1982-056/Foidel Creek Mine JDM <br /> <br /> <br /> <br />Train Loadout SAE <br /> <br />The east Pond B sump has been cleared of material as was noted in the October inspection. The ditch into the <br />sump has been re-established and the non-coal waste has been removed from the ditch. <br /> <br /> <br />Pond B Sediment Sump <br /> <br />PROCESSING WASTE/COAL MINE WASTE PILES Rule 4.10 and 4.11 <br />Drainage Control; Surface Stabilization; Placement: <br />The coal refuse disposal area (CRDA) and coal refuse disposal area expansion are constructed west of the <br />reclaimed valley and to the west of the Area 1 Pit. The CRDA and expansion continues to be an active refuse pile <br />in construction. <br /> <br />Refuse material continues to be placed in the RDA expansion area. Material was being stockpiled at the middle of <br />the RDA at the time of the inspection. The RDA was snow-covered and well compacted at the time of the <br />inspection. The refuse material had not yet reached the head of the under-drain of the RDA. <br /> <br />During the October complete inspection the northern portion of the RDA Expansion, where the new material <br />meets the existing RDA material, showed evidence of a small amount of cover material on the existing RDA. This <br />material is required to be stripped and salvaged to avoid placement of the new material on unsuitable material. <br />Number of Partial Inspection this Fiscal Year: 3 <br />Number of Complete Inspections this Fiscal Year: 2 <br /> <br />35 <br />Page of <br /> <br /> <br />