Laserfiche WebLink
2.10 MAPS AND PLANS <br />2.10.2 Permit and Adjacent Area <br />The Mine Plan Map No. 14, shows each of the phases during which surface <br />coal mining operations will be conducted underground. The Facilities Maps <br />Nos. 15 -1, 15 -2, 15 -3 and 15 -4 show where surface coal mining operations <br />will be conducted on the surface. The surface facilities were constructed <br />during 1997. <br />The Previously Mined Areas Map No. 25, shows the areas where surface <br />coal mining operations occurred prior to August 3, 1977. The Farmers Mine <br />(D -2 Seam), King Mine (B -2 Seam), King Mine (A- Seam), Gelwick Mine (A- <br />Seam) and Blackburn Mine (A -Seam) and a portion of the Blue Ribbon Mine <br />were all mined prior to August 3, 1977. The Bowie No. 1 East Mine, Blue <br />Ribbon Mine and Somerset Mine were operated after August 3, 1977. <br />The Previously Disturbed Areas Map No. 26, shows the areas where surface <br />coal mining operations occurred prior to August 3, 1977 on the surface. All <br />of the areas shown as disturbed were disturbed prior to August 3, 1977. <br />According to the Cultural Resources Inventory Report presented in Volume <br />III, Exhibit 2, the Adolph Coors Company disturbed the Bowie townsite after <br />1977. The company also razed the tipple and gravity plane after 1977. <br />However, the total extent of the disturbed area was probably not significantly <br />increased by the work performed by Coors after August 3, 1977. <br />PR -14 2.10-1- 03/14 <br />