Laserfiche WebLink
MINE <br />The wash plant consumption is estimated as follows based washing 1.8 <br />million tons per year. Wash down water is re- circulated. <br />Acre -Feet <br />Plus 14 Mesh = 85% of coal with 4% added moisture 45.1 <br />14 Mesh X 100 Mesh is 10% of coal with 12% added moisture 15.9 <br />Minus 100 mesh is 5% of coal with 30% added moisture 8.0 <br />Total 69.0 <br />In summary the Bowie No. 2 Mine is expected to consume: <br />Item <br />Acre -Feet <br />Road Dust Suppression <br />8.9 <br />Pond Evaporation <br />4.0 <br />Underground Dust Suppression <br />Longwall <br />109.3 <br />Continuous Miner(s) <br />27.2 <br />Conveyor Sprays <br />12.6 <br />Underground Roadways <br />6.5 <br />Conveyor Sprays - Surface <br />62.8 <br />Reclaim Tunnel Spray - Portal Bench <br />6.5 <br />Reclaim Tunnel Spray - Lower Coal Stockpile (Same as portal) <br />6.5 <br />Unit Train Loadout <br />1.1 <br />Wash Plant <br />69.0 <br />Bathhouse /Domestic <br />8.2 <br />Total estimated consumptive use 322.6 <br />See the table below regarding actual consumptive use. Consumptive use <br />through 2012 has been less than the 322.6 acre feet estimated above. <br />PR -14 2.04-123- 09/14 <br />