2014-11-14_REPORT - M1980244 (3)
DRMS
>
Day Forward
>
Report
>
Minerals
>
M1980244
>
2014-11-14_REPORT - M1980244 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:55:24 PM
Creation date
11/18/2014 7:16:32 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
REPORT
Doc Date
11/14/2014
Doc Name
Weekly CQA Report: Week ending 11/01/14.
From
CC&V
To
DRMS
Email Name
TC1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
W11M11% <br />Stockpiled material from ADR station 20 +00 and 40 +00 to 45 +00 was hauled to ADR haul road <br />stations 65 +00 to 75 +00 and placed and compacted as structural fill (Day and night shift). <br />Materials originating from the Surge area east of Phase 2 Diversion Channel Station 50 +00 and <br />above ADR haul road stations 15 +00 to 17 +00 and 55 +00 to 60 +00 were hauled upslope of K <br />Bench stations K38 +00 to K40 +00 where they were placed and compacted as structural fill. (Day <br />and night shift). <br />A Cat dozer performed slope contouring and finish grading between stations D2 +00 and D4 +00. <br />Excess material was stockpiled for subsequent haul and placement. <br />The ADR haul road berms were built up for Cat 793 haul truck use from stations 30 +00 to 75 +00 <br />(night shift). <br />A Cat dozer and a loader relocated the access road between the rip rap processing plant and <br />ADR haul road station 44 +00. <br />Subgrade: <br />New subgrade was accepted during this reporting period upslope of ADR haul stations 15 +00. <br />See the attached figure of accepted subgrade in the Phase 1 area. <br />Soil Liner Fill (SLF): <br />SLF was hauled from the Cameron borrow area and stockpiled below stations F0 +00 to F10 +00. <br />SLF hauled from the VLF stockpile located downslope of stations F0 +00 to F10 +00 was spread <br />with Cat dozers in an approximate 1 -foot thick loose lift between stations B10 +00 to 1317 +00. The <br />SLF surface was compacted and checked for density and moisture and was accepted for liner <br />placement. <br />See the attached Soil Liner Fill Map for accepted SLF in the Phase 1 area. <br />Cameron Site: SLF processing continued at the Cameron Site. <br />Underdrain System: <br />Primary Underdrain: Complete. <br />Secondary Underdrain: No work was performed during this reporting period. <br />Tertiary Underdrain: No work was performed during this reporting period. <br />B) Underground Workings: <br />No underground remediation or confirmatory drilling occurred during this reported period. <br />C) Geomembrane: <br />Phase 1 80 -mil DSMS LLDPE Liner Installation <br />Forty -eight rolls of 80 -mil DSMS geomembrane liner were deployed. Panels P55 through P114 <br />were installed totaling 248,663 square feet with 10,986 lineal feet of welded seams and 1,492 <br />lineal feet of extrusion welded seams. <br />Panels C -1 through C -7 were deployed to cap the insufficient overlap between the PSSA and <br />Phase 1 liners (P -140 to P -148) totaling 276 lineal feet of extrusion welded seams. <br />2014- 11- 01 -MLE2 WEEKLY FINAL Page 2 of 7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.