Laserfiche WebLink
ATTACHMENT A <br />AMEC - 2014 CQA Field Staff Schedule MLE2 <br />W II <br />Name <br />Sun. <br />Mon. <br />Tues. <br />Wed. <br />Thurs. <br />Fri. <br />Sat. <br />Nov.2 <br />Nov.3 <br />Nov.4 <br />Nov.5 <br />Nov.6 <br />Nov.7 <br />Nov.8 <br />Tim Burkhard <br />PR <br />PR <br />PR <br />PR <br />PR <br />PR <br />Ben Melly <br />GL <br />GL <br />GL <br />GL <br />Robert Redd <br />LS <br />LS <br />LS <br />Tyler Browning <br />GT <br />GT <br />GT <br />GT <br />GT <br />Eric Lorenson <br />ST <br />ST <br />ST <br />ST <br />ST <br />Denis Koval <br />ST <br />ST <br />ST <br />ST <br />ST <br />Al Frias <br />ST <br />ST <br />ST <br />Mel Ford <br />ST <br />ST <br />ST <br />ST <br />Rick Buxton <br />ST <br />ST <br />ST <br />ST <br />ST <br />ST <br />Nick Anderson <br />ST <br />ST <br />ST <br />ST <br />ST <br />Rex Harrison <br />ST <br />ST <br />David Woolley <br />ST <br />ST <br />ST <br />ST <br />ST <br />ST <br />Shawn Wisely <br />ST <br />ST <br />ST <br />ST <br />ST <br />ST <br />Razi Molloy <br />LT <br />LT <br />LT <br />LT <br />LT <br />Andrea Meduna <br />PM <br />Rich Weber <br />PM <br />LEGEND: <br />PL = Project Lead <br />PM = Project Manager <br />PCE = Project Certifying Engineer <br />PE= Project Engineer <br />PR = Project Resident <br />LG = Lead Geosynthetics Engineer <br />LS = Lead Soils Technician <br />ST = Soil Technician <br />LT = Laboratory Technician <br />GL = Geosynthetics Lead <br />GT = Geosynthetics Technician <br />FLM= Field /Laboratory Manager <br />UG = Underground Working Remediation <br />SE = Senior Engineer <br />GS = Geophysics Survey Geologist <br />HY = Highway Design Engineer <br />2014 -11 -08 -MLE2 WEEKLY FINAL.DOCX Page 5 of 7 <br />