My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-11-14_REPORT - M1980244
DRMS
>
Day Forward
>
Report
>
Minerals
>
M1980244
>
2014-11-14_REPORT - M1980244
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:55:24 PM
Creation date
11/18/2014 7:15:53 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
REPORT
Doc Date
11/14/2014
Doc Name
Weekly CQA Report: Week ending 11/08/14.
From
CC&V
To
DRMS
Email Name
TC1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ameO <br />CQA ACTIVITIES: <br />I) Field Activities: Field activities and observation during this reporting period included: Slope grading <br />and fill placement; HVSCS pipe fusion, layout, and backfilling; Phase 1 SLF surface acceptance; <br />geomembrane liner installation, repair, and acceptance; LVSCS, LDF, and SLF sampling; and leak <br />detection trench installation. <br />11) Laboratory Activities: Permeability, Atterberg limits, moisture, and sieve analysis laboratory testing <br />continued. <br />The following samples were collected and returned to AMEC's laboratory for analysis: <br />Y Low Volume Solution Collection System fill sample LVSCS -90C (Control sample) <br />Soil Liner Fill samples SLF -161C and SLF -162C (Control samples from the Cameron site) <br />r Leak Detection Fill sample 1 LDF -1 R (Record Sample) <br />General Project Items <br />Meetings and Discussions: <br />Weekly Contractor Meeting November 5, 2014 (CC &V, AMEC, and Ames) <br />Y CC &V Monthly Health and Safety Meeting November 6, 2014 <br />Ames daily safety meetings <br />ECA daily safety meetings <br />Summary of Concerns: None. <br />CC &V: Daily updates, reporting, and scheduling are some of the tasks occurring between CC &V <br />Projects, AMEC, and Ames. <br />Miscellaneous: Ames' crusher changed from drain cover fill production and resumed low volume solution <br />collection fill production operations. <br />Deliveries: None <br />Submitted by: <br />Revie urkb rd- <br />Tim ur � <br />Pro ct Resident <br />Phone 719- 689 -2986 <br />CC &V Projects <br />Reviewed By: <br />Reviewed By: zje ' <br />Date: November 11, 2014 <br />Date: November 11, 201_ <br />Date: //Z/21i4 <br />Date: // , / -Z .-L!�— <br />2014- 11 -08 -MLE2 WEEKLY DaAFT.DOCX Page 4 o'7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.