sequencing described in the reclamation plan. For example, backfilling in BF-VIII(Mining <br /> Area D-1) will be occurring while mining in Mining Area D-2. When mining in Mining Area <br /> D-2 is complete, we will move to Mining Area D-3 and backfill BF-IX(Mining Area D-2) <br /> concurrently. Backfilling in Mining Area D would occur upon mining in Mining Area B. <br /> 7. The Mining Plan states the mining areas are subject to change based on market conditions. <br /> Please note that any change to the size or sequence of a mining area will require Division <br /> approval through a Technical Revision. Please respond. <br /> PLS Response: PLS acknowledges that any change to size or sequence of mining areas will <br /> require Division approval through a Technical Revision. This statement was placed in the <br /> plan to recognize that the market dictates the mining sequence and progression. If changes or <br /> deviations to the plan triggered by market conditions are required,PLS will pursue a <br /> Technical Revision upon such decision. <br /> 8. As required by rule 6.4.4(f)(i),please describe the nature, depth, and thickness of the deposit <br /> to be mined or otherwise describe where in the permit file this information can be obtained. <br /> PLS Response: Please refer to the typical cross section sketch for details on the deposit. In <br /> general, there is 3"to 12"layer of topsoil,followed by a 25'to 50'overburden layer, then 5'to <br /> 7'of dolomite,followed by 12'to 15'of limestone, with a 20'to 25'layer of innerburden <br /> sandstone between another 15'to 18'layer of limestone. <br /> 6.4.5 Exhibit E—Reclamation Plan <br /> 9. The Reclamation Plan states topsoil is not available in any appreciable amount. This may <br /> be true for the historically mined area. However, the Soil Conservation Service report <br /> included with Exhibit I states Mapping Unit XR2-DE contains a complex of moderately <br /> deep and shallow loamy soils which range from 10-40 inches in depth. Mapping Unit <br /> XR2-DE corresponds to the majority of the 108.5 acres which are being added to the <br /> permitted area. The soils on the east side of the site, which exhibit a greater depth and <br /> quality should be replaced in the same area during final reclamation. Please provide a brief <br /> plan describing how topsoil in this area will be handled and replaced. <br /> PLS Response: PLS agrees there will be more topsoil than historical operations from the <br /> Mapping Unit XR2-DE. PLS has been conservatively estimating anywhere from 3"to 12"of <br /> topsoil for this area. PLS will scrape the topsoil that is above the overburden material and <br /> stockpile inclose proximity for use in reclaiming the previously mined areas. It is anticipated that <br /> no further material handling,such as screening, will be required for this area. <br /> 10. The Reclamation Plan calls for replacing 24 inch sandstone overburden along with <br /> sandstone fines in lieu of topsoil. Will the crushed sandstone and fines be mixed together? <br /> The Division recommends placing crushed sandstone, followed by a layer of sandstone <br /> fines. Please provide the Division with additional detail on how the site will be prepared <br /> for final seeding including the depth of sandstone fines to be used. <br /> PLS Response: As recommended,PLS will backfill with the sandstone overburden,followed by <br /> crushed sandstone(approximately 12'9 material, a layer of sandstone fines(approximately 4"--6'9 <br /> is then applied, with topsoil following the sandstone fines. <br />