Laserfiche WebLink
Tom Bird, GCC Energy, LLC <br />C- 1981 -035 / TR -20 / AR #2 <br />14- Nov -2014 <br />Page 7 of 7 <br />c) Please label the slope on the face of the pile, e.g. 2.5h:1v. This item addressed with the 06- <br />Oct -2014 response. <br />4. Map King 1 -011 Final Contour <br />This map was not revised for this application, but it will need to be submitted. It should <br />incorporate the final proposed configurations of both the West Waste Bank and Refuse Pile coal <br />mine waste disposal areas. <br />Revised Map 011 was submitted with GCC's 06- Oct -2014 response. Surface water features <br />appear to be generally consistent with those described in Appendix 12(5) Task 24, although new <br />ditches B, C, E and F are proposed for the general area of the West Waste Bank. The <br />configuration currently shown is acceptable for now. However, please be advised that the <br />Division will be conducting a thorough review of the surface water control features with the <br />permit's Midterm Review scheduled for this winter. <br />(-r)-,t Fctimnta <br />The Division will be updating the Reclamation Cost Estimate to include costs associated with the West <br />Waste Bank. This will be forwarded to GCC as soon as it is complete. <br />You are welcome to contact me with any questions you may have. <br />Best /regards, <br />Marcia L. Talvitie, P.E. <br />Environmental Protection Specialist <br />Cc: Dan Hernandez, DRMS <br />