Laserfiche WebLink
October 22, 2014 C- 1996 - 084 /Lorencito Canyon Mine LDS <br />Culvert C5 was in place at the northern most corner of the triangle made by the three roads above the <br />shrub plot. The location is slightly different from that shown on map 2.05.3.7. <br />GENERAL MINE PLAN COMPLIANCE: <br />TR18 is in progress. <br />REVEGETATION — Rule 4.15 <br />Vegetative Cover; Timing: <br />Extensive work had been done with the hydro- seeder, areas that had been seeded include: <br />• the inlet to C 12; <br />• the slope down from the road to the shrub plot; <br />• the lower section of the slope above pond 6; <br />• the outlet to C4 <br />Areas that had not been seeded /repaired but maybe could be include: <br />• the pond cleanings (and the slope above them); <br />• the repairs on and east of fill 8; <br />• parts of the "nob" <br />SLIDES and DAMAGE - Rule 4.12: <br />Damage to the down - drains on fills 7 and 9 had been repaired. These structures will need to be monitored <br />to see how they hold up following future storms. <br />DOCUMENTS RECEIVED <br />N/A <br />OTHER (SPECIFY) <br />N/A <br />ENFORCEMENT ACTIONS /COMPLIANCE <br />No enforcement actions were initiated as a result of this inspection, nor are any pending. <br />Number of Partial Inspection this Fiscal Year: 2 <br />Number of Complete Inspections this Fiscal Year: 2 <br />Page 3 of 18 <br />