My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-10-17_PERMIT FILE - C1981035A (3)
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1981035
>
2014-10-17_PERMIT FILE - C1981035A (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/20/2016 8:55:18 AM
Creation date
11/13/2014 10:16:03 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981035A
IBM Index Class Name
Permit File
Doc Date
10/17/2014
Doc Name
Licenses and Permits
Section_Exhibit Name
KII Appendix 02 Licenses and Permits
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
82
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
a nonevaporative sewage disposal system. As a result, the mine's domestic depletion will be <br />0.17 acre -feet a year. The commercial/industrial use is deemed to be 100% consumptive. The <br />depletions for the GCC Well Field affect Hay Gulch. <br />9.5. Instantaneous depletions. The GCC Well Field may be used only for <br />commercial/industrial uses if the wells serving such uses are located within 100 feet from HGD <br />or the drainage channel in Hay Gulch. Depletions from wells located within 100 feet from the <br />HGD or Hay Gulch drainage channel shall be deemed to have an instantaneous impact to the <br />stream Depletions from well diversions for domestic use shall be deemed to be instantaneous to <br />Hay Gulch, whether or not such wells are located 100 feet from the HGD or Hay Gulch drainage <br />channel. <br />9.6. Administration. Applicant will meter the amount of water withdrawn from the <br />GCC Well Field and will account separately for the amount of water that is used for domestic <br />purposes and the water that is used for commercial/industrial uses. When the diversions from the <br />GCC Well Field are out of priority, Applicant will replace 15% of the water that is applied to <br />domestic use and 1001/6 of the water that is used for commercial /industrial purposes. <br />9.7. Replacement, The out -of- priority depletions from the GCC Well Field will be <br />replaced by one or a combination of the sources set forth in Paragraph 10.3, above. Said water <br />may be either released from the GCC Reservoir described in Paragraph 8, above, and discharged <br />into the HGD, or the Applicant will forgo the diversion of CCU from the Leased Shares, and <br />discharge such CCU at the return flow location described in Section 6.8.6 to replace out -of- <br />priority depletions. <br />9.8. Remarks. In the event that the wells drilled pursuant to the GCC Well Field ground <br />water right are unable to produce at the rite of flow necessary to supply the proposed uses, GCC <br />will provide water for said uses by withdrawing water from the GCC Reservoir. In such case, <br />the operation of the augmentation plan under this paragraph 9 will not be necessary. <br />10. The Court finds that the change of water right described in Paragraph 6, above, will <br />maintain historical conditions on the La Plata River and will not injuriously affect the owners of <br />or persons entitled to use water under a vested water right or a decreed conditional water right. <br />11. The Court further finds that the Applicant initiated the appropriation for the GCC Well <br />Field and for the GCC Reservoiron December 31, 2007, and that since that date, the Applicant <br />has proceeded with diligence to develop said water rights. <br />12. The GCC Well Field and the GCC Reservoir are not speculative. Applicant has <br />demonstrated that it can and will apply water diverted pursuant to said water rights to the <br />claimed beneficial uses with diligence and within a reasonable time. <br />
The URL can be used to link to this page
Your browser does not support the video tag.