My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-10-17_PERMIT FILE - C1981035A (3)
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1981035
>
2014-10-17_PERMIT FILE - C1981035A (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/20/2016 8:55:18 AM
Creation date
11/13/2014 10:16:03 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981035A
IBM Index Class Name
Permit File
Doc Date
10/17/2014
Doc Name
Licenses and Permits
Section_Exhibit Name
KII Appendix 02 Licenses and Permits
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
82
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
.-.. �-N <br />8.4. ARREnriation Date: December 31, 2007 when filled from the junior La Plata River <br />flows or the GCC Well Field, and the priority of the Leased Shares when filled under the change <br />of water right described in paragraph 6 herein. <br />8.5. Location and Description of Storage Facility The water will be stored in an <br />underground reservoir that will be constructed in the NWA of Section 36, T35N, R12W, <br />NMPM, La Plata County, Colorado, and in a storage tank located near the reservoir site. The <br />reservoir will be created by the extraction of coal. The location set forth above is a proposed <br />location and may change to conform to the as -built location. GCC will provide an as -built <br />location with distances from section lines when it files an application to make the GCC <br />Reservoir right absolute. <br />8.6. Administration. All water delivered to and diverted from storage will be metered <br />through a 100,000 gallon water storage tank near the proposed underground reservoir site. Water <br />immediately needed for Applicant's operations will be pumped directly from the tank. Any extra <br />inflow not needed for immediate uses will be conveyed from the tank to the reservoir. If inflows <br />are not adequate for Applicant's uses, water will be conveyed from the reservoir to the tank, and <br />then to the end uses. <br />9. Augmentation Plan <br />9.1. Description of Plan: This plan will allow the GCC Well Field to operate out of <br />priority. GCC will replace the out -of -priority depletions that result from out -of- priority <br />diversions from the GCC Well Field in time, amount, and location either by discharging water <br />from the GCC Reservoir, as described in Paragraph 8, above, into Hay Gulch, or by leaving fully <br />consumable water to which GCC is legally entitled in Hay Gulch. Said fully consumable water <br />may be attributable either to the Leased Shares changed herein, or to water diverted in priority <br />under the GCC Reservoir water right, as described in Paragraph 8, above. <br />9.2. Augmented Structures: GCC Well Field, as described in Paragraph 7, above. <br />9.3. Replacement Water SuMly: <br />9.3.1. CCU water associated with the Leased Shares, as changed in accordance <br />with Paragraph 6, above. <br />9.3.2. Water diverted pursuant to the GCC Reservoir water right, as described in <br />Paragraph 8, above. <br />9.4. Depletions. The water diverted out -of- priority by the GCC Well Field will be used for <br />commercial/industrial, and domestic purposes at the GCC mining facility, the location of which <br />is described in paragraph 6.8.2. The mine's domestic demand is estimated to be 1.16 acre-feet <br />per year. See Table 1. Said use is assumed to be 15% consumptive, due to GCC's utilization of <br />6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.