Laserfiche WebLink
Sediment pond. <br />Culvert catch basin for clean water diversion. <br />GENERAL MINE PLAN COMPLIANCE: <br />Sump. <br />Coal fines were observed below the sediment pond and need to be removed from the area and placed in the <br />designated areas as approved by the permit for compliance. This is a high priority maintenance item. <br />The water tank that was pushed off the storage lay down area north of the sediment pond has been put back into <br />the laydown area. <br />