Laserfiche WebLink
Page 1 of 3 <br />TRUCK /LOADER TEAM WORK <br />Task description: Backfill and Regrade Transformer and Rock Dust Cut Slope <br />Site: New Elk Mine Permit Action: Permit Renewal 06 Permit/Job #: C1981012 <br />PROJECT IDENTIFICATION <br />Task #: 603 State: Colorado Abbreviation: None <br />Date: 5/12/2014 County: Las Animas Filename: C012 -633 <br />User: JRS <br />Agency or organization name: DRMS <br />HOURLY EQUIPMENT COST <br />Truck Loader Team - Truck: Generic 10 -12 cy, 6x4 <br />- Loader: CAT 950H <br />Support Equipment -Load Area: Cat D9T - 9SU <br />-Dump Area: Cat D9T - 9SU <br />Road Maintenance -Motor Grader: CAT 14M <br />-Water Truck: Water Tanker, 5,000 Gal. <br />Shift basis: 1 per day <br />Cost Breakdown: Truck/Loader Team Support Eauipment Maintenance Eauipment <br />Total work team cost/hour: $1,014.79 <br />MATERIAL QUANTITIES <br />Initial volume: 17,500 CCY Swell factor: 1.125 <br />Loose volume: 19,688 LCY <br />Source of estimated volume: Division of Reclamation, Mining & Safety <br />Source of estimated swell factor: Operator Estimate <br />Material Purchase Cost: $0.00 <br />Total Cost: $0.00 <br />HOURLY PRODUCTION <br />Truck Capacity: <br />Truck Payload (weight) B <br />Material weight <br />Description <br />Rated Payload <br />Payload Capacity <br />asis: <br />1 Pounds /LCY <br />User Provided <br />35,400 Pounds <br />35,400.00 LCY <br />CIRCES Cost Estimating Software <br />Truck <br />Loader <br />Load Area <br />Dump Area <br />Motor Grader <br />Water Truck <br />%Utilization- machine: <br />100 <br />100 <br />100 <br />100 <br />50 <br />50 <br />Ownership cost /hour: <br />$12.65 <br />$24.51 <br />$72.57 <br />$72.57 <br />$42.03 <br />$20.53 <br />Operating cost/hour: <br />$63.40 <br />$43.81 <br />$143.16 <br />$143.16 <br />$34.94 <br />$23.89 <br />Ripper op. cost/hour: <br />NA <br />$0.00 <br />$0.00 <br />$0.00 <br />$0.00 <br />$0.00 <br />Operator cost/hour: <br />$0.00 <br />$37.13 <br />$38.01 <br />$38.01 <br />$24.47 <br />$27.88 <br />Unit Subtotals: <br />$76.05 <br />$105.45 <br />$253.73 <br />$253.73 <br />$101.43 <br />$72.30 <br />Number of Units: <br />3 <br />1 <br />1 <br />1 <br />1 <br />1 <br />Group Subtotals: <br />Work: $333.60 <br />Support: $507.46 <br />Maint: $173.73 <br />Total work team cost/hour: $1,014.79 <br />MATERIAL QUANTITIES <br />Initial volume: 17,500 CCY Swell factor: 1.125 <br />Loose volume: 19,688 LCY <br />Source of estimated volume: Division of Reclamation, Mining & Safety <br />Source of estimated swell factor: Operator Estimate <br />Material Purchase Cost: $0.00 <br />Total Cost: $0.00 <br />HOURLY PRODUCTION <br />Truck Capacity: <br />Truck Payload (weight) B <br />Material weight <br />Description <br />Rated Payload <br />Payload Capacity <br />asis: <br />1 Pounds /LCY <br />User Provided <br />35,400 Pounds <br />35,400.00 LCY <br />CIRCES Cost Estimating Software <br />