My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-11-04_REVISION - C1981012
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981012
>
2014-11-04_REVISION - C1981012
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:55:14 PM
Creation date
11/10/2014 8:14:15 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981012
IBM Index Class Name
Revision
Doc Date
11/4/2014
Doc Name
Cost Estimate
From
DRMS
To
New Elk Coal
Type & Sequence
TR68
Email Name
LDS
MPB
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
145
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Bulldozer Worksheet Cont'd Task # 601 Page 2 of 2 <br />Job Condition Correction Factor <br />Operator Skill: <br />Material consistency: <br />Dozing method: <br />Visibility: <br />Job efficiency: <br />Spoil pile: <br />Push gradient: <br />Altitude: <br />Material Weight: <br />Blade type: <br />Source <br />0.900 <br />(AB_AVG_) <br />0.900 <br />(CAT HB)) <br />1.000 <br />(GEN.) <br />1.000 <br />(AVG.) <br />0.830 <br />(1 SHIFT /DAY) <br />0.800 <br />(FND -RF) <br />0.903 <br />(CAT HB) <br />1.000 <br />(CAT HB) <br />1.079 <br />(CAT HB) <br />1.000 <br />(PAT) <br />Net correction: 0.5240 <br />Adjusted unit production: <br />Adjusted fleet production: <br />JOB TIME AND COST <br />651.44 LCY /hr <br />1954.32 LCY /hr <br />Fleet size: 3 Dozer(s) <br />Unit cost: $0.416 /LCY <br />Total job time: <br />Total job cost: <br />83.38 Hours <br />$67,831.75 <br />CRCES Cost Estimating Software <br />
The URL can be used to link to this page
Your browser does not support the video tag.