My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-11-04_REVISION - C1981012
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981012
>
2014-11-04_REVISION - C1981012
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:55:14 PM
Creation date
11/10/2014 8:14:15 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981012
IBM Index Class Name
Revision
Doc Date
11/4/2014
Doc Name
Cost Estimate
From
DRMS
To
New Elk Coal
Type & Sequence
TR68
Email Name
LDS
MPB
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
145
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 1 of 2 <br />BULLDOZER WORK <br />Task description: Push Temporary Coal Stockpiles to Conveyor <br />Site: New Elk Mine Permit Action: Permit Renewal 06 Permit/Job #: C1981012 <br />PROJECT IDENTIFICATION <br />Task #: 606 State: Colorado <br />Date: 5/12/2014 County: Las Animas <br />User: JRS <br />Agency or organization name: DRMS <br />Abbreviation: None <br />Filename: C012 -606 <br />HOURLY EQUIPMENT COST <br />Basic Machine: Cat D9T - 9SU <br />Horsepower: 405 <br />Blade Type: Semi - Universal <br />Attachment: NA <br />Shift Basis: 1 per day <br />Data Source: (CRG) <br />Cost Breakdown: <br />Utilization % <br />Ownership Cost /Hour: <br />$72.57 <br />NA <br />Operating Cost/Hour: <br />$143.16 <br />100 <br />Ripper op. Cost /Hour: <br />$0.00 <br />0 <br />Operator Cost /Hour: <br />$38.01 <br />NA <br />Total unit Cost /Hour: $253.73 <br />Total Fleet Cost/Hour: $761.20 <br />MATERIAL QUANTITIES <br />Initial Volume: 13,250 <br />Swell factor: 1.000 <br />Loose volume: 13,250 LCY <br />Source of estimated volume: PAP 2.05 -4a Table 18a. Push to <br />Source of estimated swell factor: Cat Handbook <br />HOURLY PRODUCTION <br />Average push distance: <br />Unadjusted hourly production: <br />Materials consistency description <br />Average push gradient: <br />Average site altitude: <br />Material weight: <br />Weight description: <br />400 feet <br />305.6 LCY /hr <br />Partly consolidated stockpile 1.1 <br />0% <br />7,000 feet <br />1,600 lbs /LCY <br />Coal - Bituminous_ Raw <br />CIRCES Cost Estimating Software <br />
The URL can be used to link to this page
Your browser does not support the video tag.