My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-11-04_REVISION - C1981012
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981012
>
2014-11-04_REVISION - C1981012
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:55:14 PM
Creation date
11/10/2014 8:14:15 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981012
IBM Index Class Name
Revision
Doc Date
11/4/2014
Doc Name
Cost Estimate
From
DRMS
To
New Elk Coal
Type & Sequence
TR68
Email Name
LDS
MPB
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
145
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Truck/Loader Worksheet Cont'd <br />Truck Travel (Haul & Return) Time: <br />maintained 3.0 <br />Haul Route: <br />Task # 633 Page 3 of 3 <br />Road Condition: Firm, smooth, rolling, dirt /lt. surfaced, watered, <br />Seg # <br />Haul Distance <br />Grade ( %) <br />Roll. Res <br />Total Res <br />Velocity <br />Travel <br />(Ft) <br />( %) <br />( %) <br />(fpm) <br />Time <br />min <br />1 <br />1500.00 <br />4.00 <br />3.00 <br />7.00 <br />1568 <br />0.989 <br />Haul Time: 0.989 minutes <br />Return Route: <br />Seg # <br />Haul Distance <br />Grade ( %) <br />Roll. Res <br />Total Res <br />Velocity <br />Travel <br />(Ft) <br />( %) <br />( %) <br />(fpm) <br />Time <br />min <br />1 <br />1500.00 <br />-4.00 <br />3.00 <br />-1.00 <br />2938 <br />0.567 <br />Loading Tool unit <br />Production 551.07 <br />Truck Unit Production <br />162.82 <br />Optimal No. of Trucks: 3 <br />Return Time: 0.567 <br />Total Truck Cycle Time: 3.486 <br />LCY/Hour Adjusted for job efficiency: <br />LCY/Hour Adjusted for job efficiency: <br />Truck(s) Selected Number of Trucks: <br />Adjusted hourly truck team production: 405.43 <br />Adjusted single truck/loader team production: 405.43 <br />Adjusted multiple truck/loader team production: 405.43 <br />JOB TIME AND COST <br />Fleet size: 1 Team(s) <br />Unit cost: $2.503 /LCY <br />minutes <br />minutes <br />457.39 LCY/Hour <br />135.14 LCY/Hour <br />3 Truck(s) <br />LCY/Hour <br />LCY/Hour <br />LCY/Hour <br />Total job time: 48.56 Hours <br />Total job cost: $49,277.92 <br />CIRCES Cost Estimating Software <br />
The URL can be used to link to this page
Your browser does not support the video tag.