My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-11-04_HYDROLOGY - M1988112
DRMS
>
Day Forward
>
Hydrology
>
Minerals
>
M1988112
>
2014-11-04_HYDROLOGY - M1988112
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:55:13 PM
Creation date
11/5/2014 8:49:01 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1988112
IBM Index Class Name
HYDROLOGY
Doc Date
11/4/2014
Doc Name
San Luis Project Tailing Dam Annual and 3rd Quarter Reports.
From
Battle Mountain Resources, Inc.
To
DRMS
Permit Index Doc Type
Hydrology Report
Email Name
WHE
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
47
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DAM NAME: San Luis Tailing Dam <br />DATE OF REPORT: 05/15/14 <br />OVERALL CONDITIONS <br />Based on this inspection and recent file review, the overall surficial condition is determined to be: <br />❑ SATISFACTORY 0 CONDITIONALLY SATISFACTORY ❑ UNSATISFACTORY <br />TAILING DAM INSPECTION FORM <br />ITEMS REQUIRING ACTION BY OWNER TO IMPROVE THE SAFETY OF THE DAM <br />MAINTENANCE • MINOR REPAIR 0 MONITORING <br />0 (1) PROVIDE ADDITIONAL EROSION PROTECTION: _On right groin repair area <br />❑ (2) CLEAR BRUSH FROM: <br />❑ (3) INITIATE RODENT CONTROL PROGRAM AND PROPERLY BACKFILL EXISTING HOLES: <br />❑ (4) GRADE CREST TO A UNIFORM ELEVATION WITH DRAINAGE TO THE UPSTREAM SLOPE: <br />❑ (5) PROVIDE SURFACE DRAINAGE FOR: <br />❑ (6) MONITOR: <br />0 (7) OTHER: _Cleanout three subdrain outlets and acquire camera inspection <br />0 (8) OTHER: See additional recommendations in 2013 Detailed Inspection Report regarding flood hydraulics <br />❑ (9) OTHER: <br />ENGINEERING • EMPLOY AN ENGINEER EXPERIENCED IN DESIGN AND CONSTRUCTION OF DAMS TO: <br />(Plans and specifications to be improved by CDRMS prior to construction.) <br />❑ (10) PREPARE PLANS AND SPECIFICATIONS FOR REHABILITATION OF THE DAM <br />❑ (11) PREPARE AS -BUILT DRAWINGS OF: <br />❑ (12) PERFORM A GEOTECHNICAL INVESTIGATION TO EVALUATE THE STABILITY OF THE DAM: <br />❑ (13) PERFORM A HYDROLOGIC STUDY TO DETERMINE REQUIRED SIZE OF FLOOD BYPASS /SPILLWAY: <br />❑ (14) PREPARE PLANS AND SPECIFICATIONS FOR AN ADEQUATE SPILLWAY <br />❑ (15) SET UP OR IMPROVE MONITORING SYSTEM: <br />0 (16) OTHER: See 2013 Detailed Inspection Report for recommendations <br />❑ (17) OTHER: <br />Recommended schedule for upgrades /implementation of recommendations (please prioritize and note importance of each): <br />1) 2014 Toe drain uncovering /camera inspection, 2) 2014 erosion gulley repair, 3) See 2013 Detailed Inspection Report for other items; <br />Attachments: Piezometer readings, Photo Log <br />❑ Photographs 2 Attachments <br />ENGINEER'S INSTRUCTION: Instructed owner on the safety concerns with the structure and how to monitor and inspect the dam and <br />appurtenant works in the interim period between the regulatory annual inspections. 0 Yes ❑ No <br />Comment: <br />Professional Engineer's Signature: �� D _ Date: 5/15/2014 <br />Reviewed by: Date: <br />Owner /Owner's Representative <br />Page 3 of 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.