Weekly CQA Report - week ending 10/24/2014
From
CC&V
To
DRMS
Email Name
TC1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Ab <br />Twme <br />upslope of Bench J stations J10 +00 to J12 +00 where it was placed and compacted as structural <br />fill. <br />Subgrade: <br />No new subgrade was accepted during this reporting period. See the attached figure of accepted <br />subgrade in the Phase 1 area. <br />Soil Liner Fill (SLF): <br />SLF was hauled from the VLF stockpile below Bench F stations F0 +00 to F10 +00 to ADR haul <br />road station 15 +00 were it was placed on the slope above Bench B stations B10 +00 to B16 +00 <br />and compacted per project specification. <br />The SLF surface was reconditioned from Bench B to Bench DD between approximate stations <br />134 +00 to B12 +00. Nuclear density and moisture testing was also conducted and the area was <br />accepted for liner placement. <br />See the attached Soil Liner Fill Map for accepted SLF in the Phase 1 area. <br />Cameron Site: SLF processing continued at the Cameron Site. <br />Underdrain System: <br />Primary Underdrain: Complete. <br />Secondary Underdrain: No work was performed during this reporting period. <br />Tertiary Underdrain: No work was performed during this reporting period. <br />B) Underground Workings: <br />No underground remediation or confirmatory drilling occurred during this reported period. <br />C) Geomembrane: <br />Phase 1 80 -mil DSMS LLDPE Liner Installation <br />Twenty -two rolls of 80 -mil DSMS geomembrane liner were deployed. Panels P11 through P54 <br />were installed totaling 166,714 square feet with 8,011 lineal feet of welded seams. <br />Destructs DX -2 and DF -1 through DF -13 were marked, cut, and tested with passing results. DX- <br />3 and Destructs DF -14 through DF -20 were marked but not yet tested. <br />Approximately 462 lineal feet of anchor trench was excavated and 653 feet was backfilled over <br />the installed liner per project technical specifications. <br />D) Drain Cover Fill (DCF) <br />Ames' crusher operations continued with drain cover fill production. <br />Cat 740 trucks hauled drain cover fill to the PSSA. Haul roads for the Cat 740s were maintained <br />at least 4 feet above the secondary geomembrane and HVSCS piping. <br />Drain cover fill was placed on accepted primary liner in minimum 2 -foot lifts in the PSSA on <br />panels P19 to P20; P64 to P66; P76; P80 to P92; P122 to P130; P142 to P155; P157 to P162; <br />P193 to P195; P214 to P217; P219 to P221; P338 to P344; P347 to P353; P355 to P360; P362 to <br />P364; P366; P368; P370 to P372; and P398 to P400. (Days and 1 night shift —Night shift light <br />reading = 4.5 foot candles). <br />2014 10- 25 -MLE2 WEEKLY FINAL Page 2 Of 7 <br />