My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-10-21_REVISION - M1988044 (5)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1988044
>
2014-10-21_REVISION - M1988044 (5)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/16/2021 6:27:05 PM
Creation date
10/22/2014 7:14:33 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1988044
IBM Index Class Name
Revision
Doc Date
10/21/2014
Doc Name
TR Submittal
From
Mark A. Heifner for Schmidt Construction Company
To
DRMS
Type & Sequence
TR7
Email Name
TAK
TOD
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
79
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TR-07 MINING PLAN <br /> Seed Mix for Stockpile Protection <br /> (Broadcast seed rate - divide by 2 if drilled) <br /> Species Pounds PLS/acre Live Seeds per sq ft <br /> Blue Grama 2 32 <br /> Western Wheatgrass 5 14.5 <br /> Streambank Wheatgrass 4 14.5 <br /> Totals I 11 61 <br /> 1. Time of seeding: Whenever it is determined that seeding is necessary as dictated by the <br /> expected duration of stockpiling. <br /> 2. Post seeding treatment: If broadcast, drag the surface to help bury the seed unless the <br /> surface is very loose and has lots of crevices at the time of seeding. <br /> 3. Post planting management: Follow weed control requirements for stockpiles, but avoid <br /> using herbicides that would kill the grasses in the protective seeding(i.e. do not use <br /> Roundup® or other generalized herbicides that kill everything). <br /> Haulage of Sand or Pit Run Materials <br /> REQUIREMENT 1 S: Haulage of the sand to the processing plant or out of the site for <br /> processing elsewhere will only occur along established transportation routes. Cross-country driving on <br /> land not included in the affected land will not occur. <br /> Discussion: No land outside the affected land boundary may be disturbed by this <br /> operation as a result of mining or any related activity. <br /> REQUIREMENT 16: All drivers will observe speed limits and drivers must be <br /> aware of wildlife on the road. Wildlife always has the right-of-way. <br /> REQUIREMENT 17. If a new haulage route is needed to access a mining area and <br /> remove materials, then that new road will become a transportation corridor and all weed control <br /> requirements will apply to that road. If the roadway is subsequently reclaimed, then the reclamation plan <br /> weed control requirements will apply. If a new temporary haulage route is needed that does not go through <br /> a mined area, then establish the road along the edge of a mined area, if possible, so reclamation units are <br /> not divided by temporary roads. <br /> Coal Creek Sand Resource Amendment 3 (2005)- M-1988-044 Exhibit D Page 13 <br />
The URL can be used to link to this page
Your browser does not support the video tag.