My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-10-21_INSPECTION - C1982056
DRMS
>
Day Forward
>
Inspection
>
Coal
>
C1982056
>
2014-10-21_INSPECTION - C1982056
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:49:06 PM
Creation date
10/22/2014 6:52:33 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1982056
IBM Index Class Name
Inspection
Doc Date
10/21/2014
Doc Name
Inspection Report
From
DRMS
To
Twentymile Coal LLC
Inspection Date
10/15/2014
Email Name
JDM
DIH
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
October 15, 2014 C-1982-056/Foidel Creek Mine JDM <br /> <br /> <br />stockpiled on the Pond D embankment and the other empty. If these pipes are required, identification on <br />appropriate maps is needed. If not required all non-coal waste will need to be disposed of. <br />- A small delta has formed at the inlet of the culverts from RDA-3 and RDA-1 at Pond D and at the northern inlet <br />of Pond D. Cleanout of this area is required. <br />- The outlet of the culvert under the warehouse access road was 3/4 full of sediment at the time of the inspection. <br />The culvert will require cleaning. <br />- The culvert in ditch RP-1 under the RDA access road is damaged at the inlet and will require repair. <br />- A small gully is forming north of the water tank above the 6 NM Sediment Pond that will require repair. <br /> <br />Ditches and culverts throughout the mine site were functioning as designed. No problems were noted with the <br />exception of the following: <br />- The inlet of the first culvert from the northern most end of the 18RT access road was approximately 1/2 full of <br />sediment. The area around the inlet was cleared; however the culvert remains half full at the inlet. <br />- <br />pipes are not identified on Map 24 and no designs for these pipes exist. <br />- The ditch along haul road c near the railway crossing has been cleaned and rock checks installed. The culvert <br />from the repaired roadside ditch under the railway tracks is full of sediment and will require cleaning. <br /> <br />Haul Road C Roadside Ditch Repair <br /> <br />GENERAL MINE PLAN COMPLIANCE: <br />Twentymile Coal is in the process of a longwall move from longwall panel 15L outby to 14L. The longwall <br />shields have been brought to the surface for off-site repair or repair on-site. TR-83 proposes to ramp down from <br />the Wadge seam to the Wolf Creek seam. The Division is currently reviewing the application. As a part of the <br />application groundwater baseline data is required for the Wadge/Wolf Creek interburden and the Wolf Creek <br />seam. At the time of the inspection, contractors were on site at water wells conducting sampling. <br /> <br />PROCESSING WASTE/COAL MINE WASTE PILES Rule 4.10 and 4.11 <br />Drainage Control; Surface Stabilization; Placement: <br />The coal refuse disposal area (CRDA) and coal refuse disposal area expansion are constructed west of the <br />Number of Partial Inspection this Fiscal Year: 2 <br />Number of Complete Inspections this Fiscal Year: 2 <br /> <br />714 <br />Page of <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.