Laserfiche WebLink
information should be added as a new exhibit to the permit and cited properly on the <br />revised page. <br />a. MCM Responses to item 1 through 4: Pages 2.05 -1 and 2.05 -2 have been <br />revised to include the previously provided information on seed -mix and proof of <br />compliance. Page 2.05 -4 has been revised to clarify the statement on <br />"grandfathered" rights, and MCM's intent re: potential future mining. Page <br />2.05 -16 has been revised to clarify approvals for postmining retention of roads, <br />and reference both Maps 29 and 29a. All revised materials are included with <br />these responses. <br />b. DRMS Response: <br />i. Item #1 is resolved <br />H. Item #2 is resolved <br />W. Item #3 is resolved <br />iv. Item #4. Revised page 2.05 -16 indicates that MCM will provide <br />documentation from the State of their concurrence with permanent <br />retention of these roads. According to this paragraph, the roads intended <br />to be left in place are primarily located on lands owned by MCM or State <br />land but not exclusively. Please revise this statement to indicate the <br />prior to seeking bond release, documentation for road retention required <br />by Rule 4.03.1(1)(f) and 4.03.2(1)(g) will be submitted to the Division <br />and included in the permit through a revision. This will need to include <br />concurrence from any landowner who own land which the intended <br />roads are located. <br />c. MCM Response: The referenced text section has been revised to address the <br />revision requirements of Rule 4.03 and to be inclusive of any affected owners. <br />d. DRMS Response: This item is resolved. <br />Rule 2.05.4 -- Reclamation Plan <br />2) On the currently approved Reclamation Plan Map; Map 29 it is difficult to determine <br />which areas will be reclaimed to the following post mine land uses: <br />RangelandAVildlife, Cropland and Pasture Land. On the revised map discussed on the <br />previous item, clearly delineate which portions of the affected area will be reclaimed to <br />the designated post mine land use. <br />a. MCM Response to items 2 through 3: In order to provide all relevant <br />information, MCM will retain the existing Reclamation Plan Map, and add the <br />updated Reclamation Map as Map 29a. As appropriate, text references have <br />been modified to reference both maps. Page 2.05 -31.2 has been revised to <br />include the previously provided information, and the revised page is included <br />with these responses. <br />b. DRMS Response: <br />L Item #1 is resolved. <br />fl. Item #2 was not addressed. This item remains outstanding and will need <br />to be addressed prior to the approval of TR36 and RN6. <br />iii. Item #3 is resolved. <br />