My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2004-06-29_PERMIT FILE - C1981038A (3)
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1981038
>
2004-06-29_PERMIT FILE - C1981038A (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/21/2024 8:48:10 AM
Creation date
10/20/2014 1:11:09 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981038A
IBM Index Class Name
Permit File
Doc Date
6/29/2004
Doc Name
Colorado Discharge Permit (NPDES)
Section_Exhibit Name
Volume 7 Exhibit 08 Protection of the Hydrologic Balance
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />i~• <br />,..~ <br />=~. <br />• <br />R., <br />,c% <br />SNeEY 2 of 4- <br />-z- <br />B. Assembly <br />1. Lay out grade plates at all vertical column locations <br />and bring to proper elevation and grade. Insert the <br />bolts in the grade plates with 5/8" spring nuts to <br />hold them in place. <br />NOTE: Grade plates should have 8" of soil cushion if <br />wall sets on solid rock or unyielding soil. <br />2. Lay out one first-lift vertical connector and necessary <br />connecting channels with nuts and bolts at each grade <br />plate. Outside corners require half as many connect- <br />ing channels as intermediate vertical connectors. <br />Project drawing gives vertical connector lengths and <br />number of splices to use to make up total vertical <br />connector for various heights of wall. <br />3. Lay out one bottom spacer and two regular spacers <br />between the two end vertical connectors and one bOtLOm <br />spacer and one regular spacer between the interior <br />vertical connectors. Note that bottom spacer is not as <br />wide as the other spacers. <br />4. Attach connecting channels and spacers to vertical <br />connectors making sure bottom spacer is on bottom. Do <br />not tighten nuts snugly at this time. <br />5. Lay out 2 or 3 stringers between the asse„bled vertical <br />connectors and spacers, back and front. <br />6. Beginning at one end of the Bin-Wall, attach a stringer <br />to the grade plate and then to the connecting channel <br />on the vertical connector. Do this or. each face of <br />the Wall. Do not tighten nuts sr.ugiy at t!:is time. <br />7. Check alignment of all bins and tighten nuts on lower <br />two stringers and bottom spacer for each bi.n. <br />8. Place stringers previously laid-out and tighter, ali <br />nuts. <br />9. Partially fill the bins in 4" to 8" layers and tamp <br />thoroughly. Work compacted fill material into the <br />corrugations of all members, but do r.,t daaage wall <br />sections with tamping equipment. Take care not to <br />bulge the stringers or exterior spacers. <br />
The URL can be used to link to this page
Your browser does not support the video tag.