Laserfiche WebLink
L'Y~vVicvv iVii. rG- ta-L.i~i.,. er~v. , <br />SN~E:r 1 cF ¢ <br />,• <br />A <br />ASSEMBLY SUGGESTIONS - BIN IVALL DAMS <br />FOR ORC}IARD VALLEY MINT SETTLING PONDS <br />Preliminary Steps <br />1. Separate the parts and stack like parts together. <br />attached and following for nomenclature of parts. <br />Column pieces (vertical connector) <br />Column cap (vertical connector cap) <br />Column splice <br />Stringer stiffener <br />Stringer <br />Connecting channel <br />Spacer <br />Bottom spacer <br />Grade plates <br />Bolts <br />Nuts <br />Spring clips _ <br />See <br />Bundles and stacks should be positioned so that water <br />will drain off parts. <br />..~ <br />After parts are stacked and accessible, all parts <br />should be checked against the bill of material. <br />2. Gages are stenciled on each stringer and spacer for <br />further indentification. The project drawi~tg shows <br />the spacers. Note that the bottom spacer is a <br />different shape and gage than the rest of the spacers. <br />3. Establish the front and rear lines of the wall and the <br />location of each vertical connector. <br />Prepare an S" be3 for each grade plate at the proper <br />elevation. <br />If the base of the wall is below existing ground, 1S" <br />- 24" aide trenches may be dug for the lower wall <br />members. Trenches must be wide enough, in relation to <br />depth, to allow for proper compaction of backfill <br />adjacent to the members. <br />If solid rock or other unyielding soil is within S" of <br />the final elevatior. of the grace plates, this must be <br />removed for an area of aperoximatcly Z' x 2' and re- <br />placed with an S" thick layer o.f uncompacted fill. <br />^ <br />