Laserfiche WebLink
Quarterly Inspection Report- Refuse Pile <br />TEventymile Coal Compaaay- roidel Creek Mine <br />October 9, 2014 <br />Page 3 of 3 <br />materials or the undcrlying reclaim materials at the time the well was constructed or when observed on <br />September 30, 2014. <br />Based oil our limited observations, it appears that the pile is currently being constructed and maintained in <br />general accordance with the project specifications and plans submitted under 2.05.3(8) and that the <br />potential liazard to human life and property at the site in its present condition is minimal. This report fulfills <br />the quarterly inspection requirements as specified by Rules 4.09.1(11)(a), 4.09.1(l1)(b), 4.10.2(2)(x) and <br />4.10.2(2)(b). <br />If you have any questions regarding this report or our observations, please contact this office. <br />Sincerely, <br />NWCC, INC., <br />Timothy S. rxv'�� °�� <br />�e <br />Sr. Project Eng o a <br />2 <br />0 <br />0 4 <br />Revicwed by B 4. L r , P. <br />O � <br />Principal Engirt . ° <br />00 <br />� �J <br />oodoaaer o <br />�Jf1lAl <br />cc: Jason Musick — Environmental Protection Specialist - CDRM &S <br />NIVCC, t ac. <br />