Laserfiche WebLink
STATE HIGHWAY ACCESS PERMIT #399056 June 7, 1999 <br />Issued to Bowie Resources. Inc. <br />• <br />TERMS & CONDITIONS (cont'd) <br />37. The Prnnittee shall do all tnal si~nin~ and pavement striping or the contractor in conformance with the <br />Department's M & S standards and the M.U.T.C.D., unless otherwise a:reed [o by the Department and the <br />Permittee. .4 final signins and pavement striping plan shall he submitted to the Region 3 Traffic Engineer a <br />minimum of 4.i working da.•s prior [o comntencenten[ of work. No work shall begin without prior approval and <br />au[horiza[ion from the Department. <br />38. The roadway shoulder shall be widened to 4 feet alons the speed chance lanes and surfaced with HBP in <br />accordance with [he Department specficationr. T:e shoulder .. ,;.:::, s along through lanes shall be no less than 4 <br />feet paved or match existins and paved. <br />39. The access shall be consvuc[ed perpendicular to the travel lanes of the State Hiehway for a minimum distance of <br />~0 feet. and shall slope down and away from the adjacent pavement edge a[ a rate of 29c grade for a minimum of <br />20 feet. Ii curb and gutter are present. the slope shall be calculated from pan line to pan line. Any revisions to this <br />requirement shall be subject [o Departmen[ review and approval prior to commencement of any work within the <br />highway right-of--way. <br />40. The access shall be completed in an expeditious and safe manner and shall be finished within 45 days from <br />initiation of construction within State Highway right-of--way. <br />41. Pursuant to section 4.9(3) of the State Highway Access Code, the access roadway shall not exceed a maximum <br />grade of 8 percent within the highway right-of--way, as measured 50 feet beyond the pavement edge and extending <br />[o the right-of-way line. The access vertical grade shalt be designed and constructed in conformance with the <br />Department M & S s[andard M-203-I. <br />• 42. The desien of [he horizontal and vertical sieht distance shall be no less than the minimum requirements. as <br />provided in section 4.3 of [he State Hiehway Access Code. 2 CCR 601-1. <br />4-3. All required access improvements shall be installed prior [o the herein-authorized use of this access. <br />44. The access shall be surfaced immediately upon completion of earthwork construction and prior to use. <br />45. Compaction of Hot Bituminous Pavement shall be in accordance with section 401.17 of the Department's standazd <br />specifications. Compaction of [he Aggregate Base Course shall comply with section 304.06. <br />46. Compaction of subgrade, embankments and backfill shall be in accordance to section 203.07 of [he Department s <br />standard specifications. <br />47. Any mud or other material tracked or otherwise deposited upon the existing roadway surface shall be removed as <br />necessary to accommodate uaffic, or as directed by the depattment. <br />48. Placement of base course materials shall be in accordance with section 304.04 of the standard specifications. <br />Compaction shall be in conformance with AASHTO procedure T-99. <br />49. The surfacing shall meet [he Depattmen['s specifications as outlined Materials Recommenda[ions ob[ained from <br />the Region 3 Materials Engineer. Contact the Access Manager at (970) 243-7231 to request a materials <br />recommendation. <br />50. The new State Highway pavemen[ shall slope on the same plane as the present pavement surface. <br />51. Slopes shall be a[ a 6:1 ra[io on [he roadway and a 6:l ratio on the approach. <br />52. The existing asphalt adjacent to all new pavement shall be saw cut and removed a minimum of one foot back from <br />the existing edse. or until an acceptable existing cross slope is achieved to assure a straight edge for the joint. <br />53. The [op layer of plant mix bituminous pavement shalt not be placed between October 1 and April 1, unless <br />otherwise approved by the Department. <br />• 54. If frost. water or moisture is present in [ht subgrade, no surfacing materials shall be placed until all frost, water or <br />moisture is gone or removed. - <br />-u- <br />