Laserfiche WebLink
Mobilization Worksheet Cont'd Task#005 Page 2 of 2 <br /> EQUIPMENT HAUL DISTANCE and Time <br /> Nearest Major City or Town within project area region: WALDEN <br /> Total one-way travel distance: 17.00 miles <br /> Average Travel Speed: 30.00 mph <br /> Total Non-Roadable Mob/Demob Cost* $1,251.61 <br /> `*two round trips with haul rig: _ <br /> Total Roadable Mob/Demob Cost** <br /> **one round trip,no haul rig: $0.00 <br /> Transportation Cycle Time: <br /> Non-Roadable Roadable <br /> Equipment <br /> _ Equipment <br /> Haul Time(Hours): 0.57 0.57 <br /> Return Time(Hours): 0.57 0.57 _ <br /> Loading Time(Hours): 0.50 NA <br /> Unloading Time(Hours): 0.50 NA <br /> Subtotals: 2.13 1.13 <br /> JOB TIME AND COST <br /> Total job time: 4.27 Hours <br /> Total job cost: $1,252 <br /> CIRCES Cost Estimating Software <br />