Laserfiche WebLink
Page 1 of 2 <br /> EQUIPMENT MOBILIZATION/DEMOBILIZATION <br /> Task description: Mob/Demob <br /> Permit Action: Conversion <br /> Site: Williams/Illinois Gravel Pit Application Permit/Job#: M1997039 <br /> PROJECT IDENTIFICATION <br /> Task#: 005 State: Colorado Abbreviation: None <br /> Date: 8/27/2014 County: Jackson _ Filename: M039-005 <br /> User: PSH - <br /> Agency or organization name: DRMS <br /> EQUIPMENT TRANSPORT RIG COST <br /> Shift basis: 1 per day _ <br /> Cost Data Source: CRG Data <br /> Truck Tractor Description: GENERIC ON-HIGHWAY TRUCK TRACTOR,6X4,DIESEL POWERED, <br /> 400 HP(2ND HALF,2006) <br /> Truck Trailer Description: GENERIC FOLDING GOOSENECK,DROP DECK EQUIPMENT TRAILER <br /> (25T,50T,AND 100T) <br /> Cost Breakdown: <br /> Available Rig Ca acities 0-25 Tons 26-50 Tons 51+Tons <br /> Ownership Cost/Hour: $16.63 $18.37 $22.33 _ <br /> Operating Cost/Hour: $44.38 $46.13 $50.07 <br /> _ Operator Cost/Hour: $27.66 $27.66 $27.66 <br /> _ Helper Cost/Hour: $0.00 $25.39 $25.39 <br /> Total Unit Cost/Hour: $88.67 $117.55 $125.45 <br /> NON ROADABLE EQUIPMENT: <br /> Machine Weight/ Owner ship Haul Rig Fleet Haul Trip Return Trip DOT Permit <br /> Description Unit Cost/hr/unit Cost/hr/unit Size Cost/hr/ Cost/hr/fleet Cost/fleet <br /> (TONS) fleet _ <br /> Cat D8T-8SU 53.08 $69.05 $125.45 1 $194.50 $125.45 $250.00 <br /> Subtotals: $194.50 $125.45 $250.00 <br /> ROADABLE EQUIPMENT: <br /> Machine Description Total Cost/hr/unit Fleet Size____[Haul Trip Return Trip <br /> Cost/hr/fleet Cost1 fleet <br /> Subtotals: $0.00 $0.00 <br /> CIRCES Cost Estimating Software <br />