Laserfiche WebLink
N. No security is needed on site. Tanks will be padlocked. Only operators of each tank will <br /> have a key. Front gate is locked when work is done. <br /> O. Hours of use of facility will be daylight hours. <br /> P. There is no groundwater close to the surface of the ground. The tank is to be bedded in <br /> sand, tar line on the exterior and pit will have a pit liner installed prior to placement. <br /> Q. General <br /> No materials or wastes shall be deposited upon the site in such form or manner that they <br /> may be transferred off the site by natural causes or forces. <br /> R. Spill Protection, Monitoring, Clean Up—See Prevention, Notification and <br /> Mitigation plan from Operator Kunau Drilling <br />