My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-10-07_REVISION - C1981018
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981018
>
2014-10-07_REVISION - C1981018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:48:38 PM
Creation date
10/8/2014 10:18:01 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981018
IBM Index Class Name
Revision
Doc Date
10/7/2014
Doc Name
Adequacy Letter & Cost Estimate
From
DRMS
To
Blue Mountain Energy, Inc
Type & Sequence
MR162
Email Name
ZTT
MPB
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Bulldozer Worksheet Cont'd Task # 001 Pagel of 2 <br />BULLDOZER WORK <br />Task description: Regrade Dewatering Pond Expansion <br />Site: Deserado Mine Permit Action: MR162 Permit /Job #: C1981018 <br />PROJECT IDENTIFICATION <br />Task #: 001 State: <br />Date: 10/7/2014 County: <br />User: ZTT <br />Colorado <br />Moffat <br />Agency or organization name: DRMS <br />HOURLY EOU <br />Basic Machine: <br />Horsepower: <br />Blade Type: <br />Attachment: <br />Shift Basis: <br />Data Source: <br />Cost Breakdown: <br />IPMENT COST <br />Cat D9T - 9SU <br />405 <br />Semi - Universal <br />3 -shank ripper <br />1 per day <br />(CRG) <br />Abbreviation <br />Filename <br />Total unit Cost /Hour: $271.17 <br />Total Fleet Cost /Hour: $271.17 <br />MATERIAL QUANTITIES <br />(AVG.) <br />Initial Volume: <br />Utilization % <br />Ownership Cost /Hour: <br />$81.10 <br />Loose volume: <br />NA <br />Operating Cost/Hour: <br />$143.16 <br />100 <br />Ripper op. Cost /Hour: <br />$8.91 <br />100 <br />Operator Cost/Hour: <br />$38.01 <br />NA <br />Total unit Cost /Hour: $271.17 <br />Total Fleet Cost /Hour: $271.17 <br />MATERIAL QUANTITIES <br />(AVG.) <br />Initial Volume: <br />2,154 <br />Swell factor: <br />1.000 <br />Loose volume: <br />2,154 LCY <br />Source of estimated volume: Division of Reclamation, Mining & Safety <br />Source of estimated swell factor: Cat Handbook <br />HOURLY PRODUCTION <br />Average push distance: 50 feet <br />Unadjusted hourly production: 2,110.5 LCY/hr <br />Materials consistency description: Compacted fill or embankment 0.9 <br />Average push gradient: <br />Average site altitude: <br />Material weight: <br />0% <br />0 feet <br />2.550 lbs /LCY <br />Weight description: Earth - <br />Job Condition Correction Factor <br />Operator Skill: <br />Material consistency: <br />Dozing method: <br />Visibility: <br />Job efficiency: <br />Source <br />0.750 <br />(AVG.) <br />0.900 <br />(CAT HB)) <br />1.000 <br />(GEN.) <br />1.000 <br />(AVG.) <br />0.830 <br />(1 SHIFT /DAY) <br />None <br />CO 18-001 <br />
The URL can be used to link to this page
Your browser does not support the video tag.