My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-10-07_REVISION - C1981018
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981018
>
2014-10-07_REVISION - C1981018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:48:38 PM
Creation date
10/8/2014 10:18:01 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981018
IBM Index Class Name
Revision
Doc Date
10/7/2014
Doc Name
Adequacy Letter & Cost Estimate
From
DRMS
To
Blue Mountain Energy, Inc
Type & Sequence
MR162
Email Name
ZTT
MPB
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
COST SUMMARY WORK <br />Task description: Reclaim B -Seam Dewatering Expansion <br />Site: Deserado Mine Permit Action: MR162 Permit/Job #: C1981018 <br />PROJECT IDENTIFICATION <br />Task #: 000 State: Colorado <br />Date: 10/7/2014 County: Moffat <br />User: ZTT <br />Agency or organization name: DRMS <br />TASK LIST (DIRECT COSTS) <br />Abbreviation: None <br />Filename: CO 18-000 <br />Task <br />Description <br />Form <br />Used <br />Fleet <br />Size <br />Task <br />Hours <br />Cost <br />001 <br />Re grade Dewatering Pond Expansion <br />DOZER <br />1 <br />2.02 <br />$548.00 <br />002 <br />Replace Topsoil from Stockpile to B -Seam <br />DOZER <br />1 <br />0.94 <br />$254.00 <br />TOTAL O & P = <br />Dewatering Area <br />CONTRACT <br />AMOUNT (direct + O & P) = <br />$2,216.33 <br />003 <br />Remove Perimeter Fence Addition from <br />DEMOLISH <br />1 <br />1.00 <br />$259.76 <br />Total = <br />Dewatering Area <br />Engineering work and/or contract/bid preparation: <br />4.61% <br />Total = <br />$102.17 <br />Reseed Dewatering Expansion <br />REVEGE <br />1.52 <br />004 <br />1 <br />$716.00 <br />SUBTOTALS: <br />5.48 <br />$1,778 <br />INDIRECT COSTS <br />OVERHEAD AND PROFIT: <br />Liability insurance: 2.02% <br />Total = <br />$35.92 <br />Performance bond: 1.05% <br />Total = <br />$18.67 <br />Job superintendent: 2.74 Ins <br />Total = <br />$205.94 <br />Profit: 10.00% <br />Total = <br />$177.80 <br />TOTAL O & P = <br />$438.33 <br />CONTRACT <br />AMOUNT (direct + O & P) = <br />$2,216.33 <br />LEGAL - ENGINEERING - PROJECT MANAGEMENT: <br />Financial warranty processing (legal /related costs): <br />0.00 <br />Total = <br />0.00 <br />Engineering work and/or contract/bid preparation: <br />4.61% <br />Total = <br />$102.17 <br />Reclamation management and /or administration: <br />3.58% <br />$79.34 <br />CONTINGENCY: <br />0.00 <br />Total = <br />$0.00 <br />TOTAL INDIRECT COST = <br />$619.85 <br />TOTAL BOND AMOUNT (direct + indirect) = $2,397.85 <br />
The URL can be used to link to this page
Your browser does not support the video tag.