My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-10-06_GENERAL DOCUMENTS - C1996083
DRMS
>
Day Forward
>
General Documents
>
Coal
>
C1996083
>
2014-10-06_GENERAL DOCUMENTS - C1996083
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:48:31 PM
Creation date
10/6/2014 1:51:33 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1996083
IBM Index Class Name
General Documents
Doc Date
10/6/2014
Doc Name
Midterm Review Midterm/Cost Estimate (MT4)
From
DRMS
Permit Index Doc Type
Findings
Email Name
SLB
DIH
Media Type
D
Archive
No
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
364
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
BULLDOZER WORK <br />Task description: Regrade D- Portal Bench <br />Site: Bowie No. 2 Mine Permit Action: Midterm Review 4 Permit/Job #: C1996083 <br />PROJECT IDENTIFICATION <br />Task #: 002 State: Colorado <br />Date: 10/2/2014 County: Delta <br />User: SLB <br />Agency or organization name: DRMS <br />HOURLY EOUIPMENT COST <br />Basic Machine: <br />Cat D10T - IOSU <br />Horsepower: <br />574 <br />Blade Type: <br />Semi - Universal <br />Attachment: <br />NA <br />Shift Basis: <br />1 per day <br />Data Source: <br />(CRG) <br />Abbreviation: None <br />Filename: C083 -002 <br />Cost Breakdown: <br />(AVG.) <br />0.900 <br />(CAT HB)) <br />1.000 <br />Utilization % <br />Ownership Cost/flour: <br />$120.17 <br />NA <br />Operating Cost/Hour: <br />$184.48 <br />100 <br />Ripper op. Cost/Hour: <br />$0.00 <br />0 <br />Operator Cost/Hour: <br />$38.01 <br />NA <br />Total unit Cost/Hour: $342.65 <br />Total Fleet Cost/Hour: $1,370.61 <br />MATERIAL OUANTITIES <br />Initial Volume: 260,593 <br />Swell factor: 1.165 <br />Loose volume: 303,591 LCY <br />Source of estimated volume: Operator Estimate <br />Source of estimated swell Cat Handbook <br />factor: <br />HOURLY PRODUCTION <br />Average push distance: <br />Unadjusted hourly <br />production: <br />100 feet <br />1,718.9 LCY /hr <br />Materials consistency description: Compacted fill or embankment 0.9 <br />Average push gradient: <br />Average site altitude: <br />Material weight: <br />10% <br />6,900 feet <br />2.900 lbs /LCY <br />Weight description: Decomposed rock - 50% Rock, 50% Earth <br />Job Condition Correction Factor Source <br />Operator Skill: <br />Material consistency: <br />Dozing method: <br />Visibility: <br />Job efficiency: <br />0.750 <br />(AVG.) <br />0.900 <br />(CAT HB)) <br />1.000 <br />(GEN.) <br />1.000 <br />(AVG.) <br />0.830 <br />(1 SHIFT /DAY) <br />
The URL can be used to link to this page
Your browser does not support the video tag.