My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-10-06_GENERAL DOCUMENTS - C1996083
DRMS
>
Day Forward
>
General Documents
>
Coal
>
C1996083
>
2014-10-06_GENERAL DOCUMENTS - C1996083
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:48:31 PM
Creation date
10/6/2014 1:51:33 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1996083
IBM Index Class Name
General Documents
Doc Date
10/6/2014
Doc Name
Midterm Review Midterm/Cost Estimate (MT4)
From
DRMS
Permit Index Doc Type
Findings
Email Name
SLB
DIH
Media Type
D
Archive
No
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
364
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 600.00 -17.00 3.00 -14.00 1377 0.566 <br />Return Time: 0.566 minutes <br />Total Truck Cycle Time: 7.474 minutes <br />Loading Tool unit <br />Production <br />600.89 <br />LCY/Hour Adjusted for job efficiency: <br />498.74 LCY/Hour <br />Truck Unit Production <br />339.28 <br />LCY/Hour Adjusted for job efficiency: <br />281.60 LCY/Hour <br />Optimal No. of Trucks: <br />2 <br />Truck(s) Selected Number of Trucks: <br />2 Truck(s) <br />Adjusted hourly truck team production: 56320 <br />LCY/Hour <br />Adjusted single truck/loader team production: 498.74 <br />LCY/Hour <br />Adjusted multiple truck/loader team production: 498.74 <br />LCY/Hour <br />JOB TIME AND COST <br />Fleet size: <br />1 <br />Team(s) Total job time: 609.56 <br />Hours <br />Unit cost: <br />$1.370 <br />/LCY Total job cost: $416,433 <br />
The URL can be used to link to this page
Your browser does not support the video tag.