My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-09-15_PERMIT FILE - C1996083A
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1996083A
>
2014-09-15_PERMIT FILE - C1996083A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:47:42 PM
Creation date
10/2/2014 9:39:11 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1996083A
IBM Index Class Name
Permit File
Doc Date
9/15/2014
Doc Name
Reclamation Cost Estimate
Section_Exhibit Name
Volume I 3.02.2 Reclamation Cost Estimate
Media Type
D
Archive
Yes
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
427
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Bowie No. 2 Mine C1996083 Technical Revision No. 87 <br />Nan) Rnnte- <br />Page 5 of 5 <br />Seg # <br />Haul Distance <br />Grade ( %) <br />Roll. Res <br />Total Res <br />Velocity <br />Travel <br />(Ft) <br />Production <br />( %) <br />( %) <br />(fpm) <br />Time <br />104.86 LCY /Hour Adjusted for job efficiency: <br />87.03 LCY /Hour <br />Optimal No. of Trucks: <br />2 Truck(s) Selected Number of Trucks: <br />min <br />1 <br />2450.00 <br />-1.60 <br />3.00 <br />1.40 <br />2895 <br />0.939 <br />Haul Time: 0.939 minutes <br />Ratnrn RnntP- <br />Seg # <br />Haul Distance <br />Grade ( %) <br />Roll. Res <br />Total Res <br />Velocity <br />Travel <br />(Ft) <br />Production <br />( %) <br />( %) <br />(fpm) <br />Time <br />104.86 LCY /Hour Adjusted for job efficiency: <br />87.03 LCY /Hour <br />Optimal No. of Trucks: <br />2 Truck(s) Selected Number of Trucks: <br />min <br />1 <br />2450.00 <br />1.60 <br />3.00 <br />4.60 <br />2814 <br />0.896 <br />JOB TIME AND COST <br />Fleet size: 1 Team(s) Total job time: 5.94 Hours <br />Unit cost: $1.478 /LCY Total job cost: $1,349 <br />CIRCES Cost Estimating Software <br />Return Time: 0.896 <br />minutes <br />Total Truck Cycle Time: 6.309 <br />minutes <br />Loading Tool unit <br />Production <br />185.10 LCY/Hour Adjusted for job efficiency: <br />153.64 LCY /Hour <br />Truck Unit Production <br />104.86 LCY /Hour Adjusted for job efficiency: <br />87.03 LCY /Hour <br />Optimal No. of Trucks: <br />2 Truck(s) Selected Number of Trucks: <br />2 Truck(s) <br />Adjusted hourly truck team production: 174.06 <br />LCY/Hour <br />Adjusted single truck/loader team production: 153.64 <br />LCY/Hour <br />Adjusted multiple truck/loader team production: 153.64 <br />LCY/Hour <br />JOB TIME AND COST <br />Fleet size: 1 Team(s) Total job time: 5.94 Hours <br />Unit cost: $1.478 /LCY Total job cost: $1,349 <br />CIRCES Cost Estimating Software <br />
The URL can be used to link to this page
Your browser does not support the video tag.